![Gladiator GCB100 Installation Instruction Download Page 2](http://html1.mh-extra.com/html/gladiator/gcb100/gcb100_installation-instruction_2230440002.webp)
- 2 -
2. Tap & Hole Measure needed to install COM and Flange Handle
①
Prepare 4 spots of Tap 6-32UNC to adhere COM.
②
Prepare to adhere the Flange Handle Assembly.
③
Prepare 2 slots of Bolt Stud 1/4-20UNC to adhere Lock to Door.
④
Installation spot may change depending on Cable Extension.
Cable Extension: 60/72 inch (1524.0/1828.8 mm)
⑤
Enclosure Depth “D” has to be at least 8.66 inch (220.0 mm).
※
Maximum Measure to Install COM
[Unit: inch (mm)]
Installation
Enclosure Depth
Spot Measure
10
12
16
18
20
24
30
36
“E” max
(254.0)
(304.8)
(406.4)
(457.2)
(508.0)
(609.6)
(762.0)
(914.4)
60
25
24
23
22
21
20
19
18
Cable
(1524.0)
(635.0)
(609.6)
(584.2)
(558.8)
(533.4)
(508.0)
(482.6)
(457.2)
Lengths 72
30
29
28
27
26
25
24
23
(1828.8)
(762.0)
(736.6)
(711.2)
(685.8)
(660.4)
(635.0)
(609.6)
(584.2)
※
Minimum Measure for Enclosure “D”
[Unit: inch (mm)]
Standard Measure “E” to install COM
0~1.77 1.77~
(0~45.0) (45.0~)
Enclosure Depth “D” Min
8.86 4.72
(225.0) (119.9)
4-(6-32UNC)
0.75
[19]
0.98
[25]
4.33
[110]
3.82
[97]
4.69
[119]
MIN 4.72
[120]
E
2-(1/4-20UNC)
STUD BOLT
R0.2
[R5]
MAX 2.52
[64]
1.24
[31.4]
2-Ø 0.26
[2-Ø 6.6]
MIN<1.18>
[30]
MAX<0.79>
[20]
MAX<2.01>
[51]
MAX<1.89>
[45]
MIN<8.66>
[220.0]
"D"
Installation Instruction