6
Installation (continued)
8
Preparing the pop-up assembly
□
Remove the bottom gasket (L) and nut (M) from
the top gasket (J) and pop-up body (K).
□
Attach these pieces together by pushing the
bottom gasket (L) down into the top of the
nut (M) and twisting together.
J
M
K
L
6
Securing the spout
□
Retighten the set screw (1) with the Hex wrench
(Hex: 2.5mm, N) to secure the spout to the valve
body. Slide the spout seat (F) and flange (G) over
the spout until it is flush with the wall.
7
Installing the handle assembly
□
Slide the flange (D) to the cold value body (H)
until the wall face. Place the handle assembly (C)
onto the value body (H). Place the set screw (B)
into handle (C) and tighten set screw (B) with the
Hex wrench (Hex: 2.5mm, N). Insert the index (A).
Repeat this procedure for the other handle on
the left (hot) side.
1
G
F
H
D
A
B
C
N