
Page 15 / 15
OTHER INFORMATION
OPERATING INSTRUCTIONS NO.04/13 FOR REMOTE-CONTROLLED, BATTERY-OPERATED
TRANSPORT SYSTEM
ROBOT 20
OTHER INFORMATION
SERVICE, REPAIRS AND ORDERING SPARE PARTS
Service/spare parts lists and ordering spare parts:
For information and to order spare parts please call our
SERVICE NUMBER:
Fax :
+1 (937)324 - 8171
Phone:
+1 (937)324 - 8867
E-mail: [email protected]
Repairs
After giving you an estimate, we will carry out any necessary maintenance and repair work quickly and professionally.
Send your device to us.
INSPECTION
Before
every use,
you must carry out a visual inspection on the transport and steering dollies:
Inspect the weld seams
Check for deformation of the trolley cassette, and the connecting bar
Check the rollers for wear and dirt
If the rollers are wearing unevenly, you must replace them on a cassette-by-cassette basis
SPECIAL DESIGNS
Our Design Department implements customer-specific lifting and moving systems and provides solutions for any heavy
load-moving problems. Let us know how we can help you.
EC DECLARATION OF CONFORMITY
We hereby declare that the GKS-PERFEKT transport dollies of types:
ROBOT 20
for factory-internal transportation of machines and heavy cargo conform to the following relevant provisions:
Directive 2006/42/EC of the European Parliament and Commission dated 17 May 2006, Appendix II A
Applicable international technical standards, in particular
DIN EN ISO 12100: Safety of machines
Applicable national technical standards and specifications, in particular
BGV D27: Accident prevention regulations for industrial trucks
Machine Safety Code (GPSG)
Georg Kramp GmbH & Co. KG
GKS - PERFEKT Hebe- und Transportsysteme
Max-Planck-Str. 32
D 70736 Fellbach
Fellbach, 05.03.2013
Kramp