GivEnergy 3600HY User Manual Download Page 6

 

1.6

 

Markings on this product 

 

 

Symbol 

description 

 

 

Warning regarding dangerous voltage 

The product works with high voltage. All work on the 
product  must  only  be  performed  as  described  in  its 
documentation. 

 

 

Beware of hot surface 

The product can become hot during operation. Do 
not touch the product during operation. 

 

 

 

Observe the operating instructions 

Read the product’s documentation before working on 
it.  Follow  all  safety  precautions  and  instructions  as 
described in the documentation. 

 

 

 

Point of connection for grounding 
protection. 

 

 

 

Direct Current (DC) 

 

 

 

Alternating Current (AC) 

 

 

Signals danger due to electrical shock and 
indicates the times (5 minutes) to allow after 
the inverter has been turned off and 
disconnected to ensure safety in any 
installation operation. 

Summary of Contents for 3600HY

Page 1: ...1 User Manual Hybrid Inverter V1 00...

Page 2: ...17 5 4 Fixed the inverter on the wall 18 5 5 Check Inverter Installation Status 19 5 6 Electrical Connection 20 5 6 1 Safety 20 5 6 2 System Diagram with Inverter Electrical 20 5 6 3 Connecting to th...

Page 3: ...3 10 2 Packing the Inverter 33 10 3 Storing the Inverter 33 10 4 Disposing of the Inverter 33 11 Operating Modes 34 12 Manufacturer Warranty 34 13 Technical Data 35 14 Contact 37...

Page 4: ...nformation Find further information on special topics in the download area 1 4 Storage of the manuals The manual and other documents must be stored in a convenient place and be available at all times...

Page 5: ...hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION indicates a...

Page 6: ...touch the product during operation Observe the operating instructions Read the product s documentation before working on it Follow all safety precautions and instructions as described in the documenta...

Page 7: ...ts of radiation In special cases there may still be interference for the specified application area despite maintaining standardized emission limit values e g when sensitive equipment is located at th...

Page 8: ...the PV generators battery using DC and AC breaker DC and AC breaker shall be able to disconnect all non ground conductors after installation u Grounding the PV modules The unit is a transformerless i...

Page 9: ...self consumption excess energy is used to charge the batteries and then fed into the public grid when the PV energy is adequate When PV energy output is insufficient to support connected loads the sys...

Page 10: ...el L Warning signals label 3 3 Storage of Inverter If you want to store the unit in your warehouse you should choose an appropriate location to store the inverter The unit must be stored in original p...

Page 11: ...external damage to the unit If there is anything damaged or missing please contact your dealer Don t dispose its original package If you want to transport the unit it is better to store the unit into...

Page 12: ...any imperfections please contact your local dealer Be sure that the inverters are connected to the ground in order to protect property and personal safety The inverter must only be operated with PV g...

Page 13: ...for a long period time Select the installation location so that the status display can be easily viewed Do not install the inverter on structures constructed of flammable materials The humidity of th...

Page 14: ...14...

Page 15: ...ggest that the inverters should be installed at the location with some cover or protection Observe the minimum clearances to walls other inverters or objects as shown in the diagram below in order to...

Page 16: ...s There must be sufficient clearance between the individual inverters to ensure that the cooling air of the adjacent inverter is not taken in If necessary increase the clearance spaces and make sure t...

Page 17: ...e as a template drill holes as illustrated in image Fix the mounting frame as the figure shows Do not make the screws to be flush to the wall Instead leave 2 to 4mm exposed In order to avoid electrica...

Page 18: ...the process please maintain the balance of the inverter Hang the inverter on the bracket through the match hooks on bracket Falling equipment can cause serious or even fatal injury never mount the in...

Page 19: ...nverter from being lifted off the bracket 5 5 Check Inverter Installation Status Check the upper straps of inverter and ensure it fits on to the bracket Check the secure mounting of the inverter by tr...

Page 20: ...inverter disconnect the inverter on the AC side PV side battery side Do not reverse input of battery That will be destroyed the inverter Danger of damage to electronic components due to electrostatic...

Page 21: ...eaker E Energy meter F Utility grid G Battery H Battery DC breaker I Back up output breaker max 2500VA J Important load max 2500VA K Load monitor Use only solid or stranded wire but not fine stranded...

Page 22: ...Name Detail A Conductor cross section See the Conductor cross section in the flowing chart B Bare length 8mm around 5 6 3 Connecting to the grid AC utility Connecting to the grid Output connection te...

Page 23: ...grid voltage which you connection Current the current much not less than 1 2 times of the inverter max output current which defined in the inverter spec We suggest the AC separate unit spec as follow...

Page 24: ...lectric shock and fire use only with PV modules and with a maximum system voltage of 600Vdc Electric shock hazard the DC conductors of this photovoltaic system are normally ungrounded but will become...

Page 25: ...ection terminal There are two MPPT s on the unit so you can connect two independent MPPT channels Suggestions for the PV modules of the connected strings u Same type u Same quantity of PV modules conn...

Page 26: ...k short circuit current of the PV string The total short circuit current of the PV string should be less than the inverter s maximum DC current Connect the positive and negative terminals from the PV...

Page 27: ...battery connection To reduce risk of injury you much use the proper recommended cable size refer to the follow The battery install much accordance with the manufacture s user manual including install...

Page 28: ...rgy inverter 5 6 6 Load monitor connect to the inverter In the system much install a CT to monitor the power of the house to decision the inverter status charger or discharger The load monitor module...

Page 29: ...e inverter via RS 485 Check the RS and RS signal wiring is right The load monitor input L line much same as the CT sensor L line and the input of the load monitor L N cannot reverse Or the inverter wi...

Page 30: ...inverter and you much set the parameter of battery according to your battery system and work status times prior Or the inverter will work at defined status that may be not conform to the battery volta...

Page 31: ...AC circuit breaker 2 Turn on the DC switch 3 Turn on the battery breaker 4 The inverter will start automatically when the PV voltage is higher than 150V the battery voltage is higher than 46 4V 8 2 Di...

Page 32: ...is any visible damage to the breaker or visible discoloration or damage to the cables contact the installer Once a year turn the rotary switch of the DC switch from the On position to the Off positio...

Page 33: ...size of the inverter 10 3 Storing the Inverter Store the inverter in a dry place where ambient temperatures are always between 25 C and 60 C 10 4 Disposing of the Inverter Do not dispose of faulty in...

Page 34: ...modes 11 Manufacturer Warranty This certificate represents a 5 year warranty for the inverter products Possession of this certificate validates a standard factory warranty of 5 years from the date of...

Page 35: ...put power 3600W 4600W 5000W Max AC apparent power 3600VA 4600VA 5000VA Max output current 16 4A 21 0A 22 8A AC nominal voltage range 220V 230V 240V 180Vac 280Vac AC grid frequency range 50 60Hz 5 Hz P...

Page 36: ...put overvoltage protection varistor Yes Ground fault monitoring Yes Grid monitoring Yes MAX inrush current 30A peak Max output fault current 40A peak Max output overcurrent protection 25A rms Integrat...

Page 37: ...approvals CE IEC 62109 1 2 VDE 0126 1 1 G83 2 AS4777 NZS 3100 Note Backup output power depends on the battery Note Specifications are subject to change without further notice 14 Contact Please contact...

Reviews: