18
Girard Systems
©
2005
The awning lead rail comes factory pre-set with a pitch angle of +/- 3°. This angle allows the lead rail
to fit snugly into the main housing cover and the back housing, making a weather-resistant seal for
travel.
To increase or decrease the angle, insert a 5mm Allen wrench into the top pitch angle screw. Turn
clockwise to increase the pitch, counterclockwise to decrease the pitch.
(Fig 9 & 10)
FIGURE 10
ADJUSTMENT OF LEAD RAIL CONNECTOR
To adjust the lead rail connector, allow it to align itself. This is done by opening awning about two
(2’) feet. Remove fabric set screw on both sides. Then loosen horizontal lead rail adjustment screws.
Align all elbows to ensure proper closing. Next, moderately tighten horizontal lead rail adjustment
screws and close awning. If awning does not close correctly, open awning two (2”) inches and
moderately hit end of lead rail which is binding. Then ensure that lead rail is even on both sides.
Close and then reopen awning and tighten horizontal lead rail adjustment screw and re-insert fabric
set screw.
Note: Arms will reset once awning is completely enclosed.
Summary of Contents for G-Link G-1500
Page 1: ......
Page 35: ...35 Girard Systems 2005...
Page 39: ...39 Girard Systems 2005 figure 24 MOUNTING AWNING TO WALL MOUNT BRACKETS...
Page 45: ...45 Girard Systems 2005 Figure 30 G 2000 Automatic lateral arm awning system wiring diagram...
Page 62: ...62 Girard Systems 2005...
Page 63: ...63 Girard Systems 2005...
Page 64: ...64 Girard Systems 2005...
Page 65: ...65 Girard Systems 2005...