background image

GS-SR113 System Installation Guide 

24 

HDD LED: 

 

 

 

 

 

 

Acting Color

Status 

Condition 

HDD 
LED 1 

Off 

N/A 

No HDD Installed 

Non-RAID 

HDD 
LED 1 

On Green 

HDD 

Installed 

Non-RAID

 

HDD 
LED 2 

Off N/A 

HDD 

idle 

Non-RAID 

HDD 
LED 2 

Blink 

Green 

HDD acting 

Non-RAID 

HDD 
LED 1 

Off 

N/A 

No HDD installed/ 
RAID fail or Rebuild

RAID 

HDD 
LED 1 

On Green 

HDD 

installed RAID 

HDD 
LED 2 

Off N/A 

HDD 

idle 

RAID 

HDD 
LED 2 

Blink Green 

HDD 

acting 

RAID 

HDD 
LED 2 

On 

Amber 

RAID fail under OS 
or no HDD detected

RAID 

HDD 
LED 2 

Blink Amber 

HDD RAID Rebuiid RAID 

HDD 
LED 2 

Blink  

Amber 

System booting 

RAID 

HDD LED 1 

HDD LED 2 

Summary of Contents for GS-SR 113

Page 1: ...GS SR 113 Rack Mount Server System Installation Guide REV 1 0 ...

Page 2: ......

Page 3: ... 2 CPU INSTALLATION 12 5 3 HEAT SINK INSTALLATION 14 5 4 MEMORY INSTALLATION 15 5 5 PCI EXPANSION CARD INSTALLATION 16 5 6 AIR FLOW DUCT INSTALLATION 18 5 7 REINSTALL TOP COVER 19 5 8 DOCK HANDLE INSTALLATION 20 5 9 HARD DISK DRIVE INSTALLATION 20 5 10 APPEARANCE OF GS SR113 22 5 10 1 FRONT VIEW OF GS SR113 22 5 10 2 REAR VIEW OF GS SR113 22 5 10 3 LED INDICATOR DESCRIPTION 23 5 11 CONNECTOR ICON ...

Page 4: ...hat may appear in this document nor does the author make a commitment to update the information contained herein Third party brands and names are the property of their respective owners Due to the rapid change in technology some of the specifications might be out of date before publication of this booklet ...

Page 5: ...e electrical grounding type plug only fits into a grounding type power outlet This is a safety feature The equipment grounding should be in accordance with local and national electrical codes The equipment operates safely when it is used in accordance with its marked electrical ratings and product usage instructions Do not use this product near water or a heat source Set up the product on a stable...

Page 6: ... shock from lightning To reduce the risk of fire use only No 26 AWG or larger telecommunications line cord Do not plug a modem or telephone cable into the network interface controller NIC receptacle Disconnect the modem cable before opening a product enclosure touching or installing internal components or touching an uninsulated modem cable or jack Do not use a telephone line to report a gas leak ...

Page 7: ...not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation FCC part 68 applicable to products fitted with USA modems The modem complies with Part 68 of the FCC Rules On this equipment is a label that contains among other information the FCC registration number and Ringer Equivalence Number REN for this equipment ...

Page 8: ... certification means that the equipment meets certain telecommunications network protective operational and safety requirements The Department does not guarantee the equipment will operate to the user satisfaction Before installing this equipment users ensure that it is permissible to be connected to the facilities of the local Telecommunications Company The equipment must also be installed using ...

Page 9: ...ppropriate electric inspection authority or electrician as appropriate NOTICE The Load Number LN assigned to each terminal device denotes the percentage of the total load to be connected to a telephone loop which is used by the device to prevent overloading The termination on a loop may consist of any combination of devices subject only to the requirement that the sum of the Load Numbers of all th...

Page 10: ...Server and retain for future reference The procedures in this guidebook assume that you are a system or network administrator experienced in installing similar hardware Manual Organization Chapter 3 Introduction provides the basic product information and the key features of the product Chapter 4 Contents Package lists the essential hardware installation components Chapter 5 System Installation Pro...

Page 11: ...llowing tips Go through the installation guide carefully before starting the system installation processes Keep the system away from static and magnetic field Do not apply any cleaning solutions directly to the system 3 1 Features The Gigabyte GS SR113 is an ultra thin rack optimized server that offers superior performance and scalability to your networking system It contains the several features ...

Page 12: ...2 Memory Supported 2 25 degree angle DIMM sockets Supports 2 DDR 266 up to 2 GB Supports ECC memory module No registered DIMM support Integrated Intel Network Adapter Features Dual Intel 82550PM Ethernet controllers Supports Wake on LAN Adapter Fault Tolerance AFT Adaptive Load Balancing ALB Fast EtherChannel FEC Intelligent Management System Standard supports IPMI v 1 0 for system monitoring Inte...

Page 13: ...timized design System Dimensions 19 W 23 D 1 74 H I O expansion slots 4 full length 32bit 33 MHz PCI slots Built in I O ports One Floppy Port up to 2 88MB One 25pin Parallel Port EPP ECP Two 9pin 16550 based serial Ports 4 USB ports One standard 15pin VGA connector Two RJ45 LAN ports P S 2 Keyboard and Mouse Connectors Power supply 250W maximum continuous required power Operating Temperature 41 to...

Page 14: ...he system please contact your vendor immediately Component Content List Chassis Power Supply Installed 8IRXR D Motherboard Installed Slim type CD ROM drive Installed Slim type Floppy drive Installed Three Hard Disk Drive Trays One CPU heat sink pack including one heat sink one thermal conductivity compound and two cooler bracket Two Dock Handle with two tow screws Driver and Application CD System ...

Page 15: ...back of the system Fig 1 Figure 1 Figure 2 Step 2 Standing at the front of the system Gently apply force to the indentures with your thumbs and push toward the rear of the chassis for about 3 4 of an inch Top cover may be lifted straight up Fig 2 Step 3 After removing the top cover you will see a plastic airflow duct over the CPU and Memory Rise up the airflow duct Fig 3 Step 4 Install CPU and oth...

Page 16: ...se make sure the CPU type and speed that are supported by the motherboard Step 2 To Install the CPU lift up the bar that located next to the socket Fig 4 Figure 4 Step 3 The noticed corner should point toward the end of lever The CPU will only fit in the orientation as shown Fig 5 ...

Page 17: ...3 System Installation Guide 13 Figure 5 Step 4 Then align the CPU and insert it into the socket Fig 6 Step 5 Push the lever back to the original position to finish the CPU installation Fig 7 Figure 6 Figure 7 ...

Page 18: ... Step 3 Seat the heat sink in the retention modules with the four screws Fig 8 Step 3 Secure the heat sink firmly with two cooler brackets There are two dark mark printed on the heat sink Align the center of the cooler bracket to the dark mark and push it down Fig 9 Step 4 Hook one end of the cooler bracket to the CPU socket as shown in the Fig 10 Hook the other end of the cooler bracket by grippi...

Page 19: ...mory Installation The motherboard contains two slanted DIMM Dual Inline Memory Module sockets The systems BIOS will auto detect the size if the memory after installing To install memory simply push the memory modules into the DIMM sockets Fig 11 Figure 11 ...

Page 20: ...33 MHz full height To install the peripheral please go through the following steps Step 1 There are two screws holding the riser bracket First remove the screw on the top of the bracket then remove another screw located at the rear of the server Fig 12 13 Figure 12 Figure 13 Step 2 Carefully pull up and remove the PCI riser bracket Fig 14 Figure 14 ...

Page 21: ...15 Figure 15 Step 4 Replace the riser bracket into the PCI slot on the motherboard Push down the bracket firmly The card is seated properly into PCI slot Figure 16 Step 5 Put the PCI raiser bracket into the server system Fig 16 Step 6 Secure the PCI slot bracket with the screws ...

Page 22: ...oothly please note that the CPU and Memory are installed in advance Remember to install the airflow duct back to into the system to ensure the consistency of system operation To install the airflow duct properly please take the following steps Step 1 Insert the airflow duct follow the arrow direction Fig 17 Figure 17 Figure 18 Step 2 After inserting the airflow duct please pay attention to the sta...

Page 23: ...rd should be completely placed under the duct cover Otherwise the upper case might not be able to close tightly 5 7 Reinstall Top Cover When complete the installation of the entire essential components from subsection 5 1 to 5 6 replace the plastic air duct This will secure the airflow is inside the chassis Failure to do so may cause CPU and Memory over heating Replace top cover insuring that the ...

Page 24: ...om the package Put two on each side of the chassis secure with screws provided Fig 21 Figure 21 5 9 Hard Disk Drive Installation Step 1 Pull the hard disk drive tray handle and remove the tray from the chassis Fig 22 Insert the hard disk drive into the tray Secure each hard disk drive with screws Fig 23 ...

Page 25: ...re 22 Figure 23 Step 2 After securing the hard disk drive with the screws hold the hard drive handle at open position place the tray into chassis Fig 24 and push the hard disk drive tray handle to the closed position Fig 25 Figure 24 Figure 25 ...

Page 26: ...allation Guide 22 5 10 Appearance of GS SR113 5 10 1 Front View of GS SR113 5 10 2 Rear View of GS SR113 CD ROM Drive Floppy Drive USB LED 2 IDE ATA Hot Swap HDD Secondary Primary Power Connectors Expansion 1 Easy Swap HDD ...

Page 27: ...us On Green System power on Power LED Off N A System power off On Green LAN online Off N A LAN offline LAN LED Blink Green LAN acting On Amber Fan fail Fan LED Off N A Fan acting System LED N A N A No definition LAN 1 LED LAN 2 LED FAN Status LED System Status LED Power LED USB Connectors ...

Page 28: ...e Non RAID HDD LED 2 Blink Green HDD acting Non RAID HDD LED 1 Off N A No HDD installed RAID fail or Rebuild RAID HDD LED 1 On Green HDD installed RAID HDD LED 2 Off N A HDD idle RAID HDD LED 2 Blink Green HDD acting RAID HDD LED 2 On Amber RAID fail under OS or no HDD detected RAID HDD LED 2 Blink Amber HDD RAID Rebuiid RAID HDD LED 2 Blink Amber System booting RAID HDD LED 1 HDD LED 2 ...

Page 29: ...GS SR113 System Installation Guide 25 5 11 Connector Icon Description Suggested icons Description Keyboard VGA Mouse LAN ParallelPort Serial Port USB ...

Reviews: