background image

 

 

 

 

 

c)  If there is no screw hole on the rack rail and the holes on the rack rail are square, 

first insert the cage nuts to the proper holes on the rail from the far side, then install 

the  rack-mount  screws  through  the  holes  of  the  mounting  bracket  onto  the  cage 

nuts to mount G4200C to the rack, two mounting screws on each side. 

 

 

 

Summary of Contents for G4200C

Page 1: ...G4200C Quick Installation Guide GIGA Copper Networks GmbH ...

Page 2: ...evice G4200C is the device of multiplexer system as shown in the following drawings It supports one 1000 X 10000 X SFP SFP uplink port one 10 100 1000BT uplink port six coax G hn ports and one gigabit MGMT port 2 1 1 Panel The front panel is shown below 10 100 1000BT Management Port 10 100 1000BT Uplink port G hn Port 1 6 Console Port 1000 X 10000 X SFP SFP Uplink port Power Input Power Switch ...

Page 3: ...tus Green On System is started Off System has not started G hn1 G hn2 G hn3 G hn4 G hn5 G hn6 G hn link status Green On The corresponding port connection normal Off There is no connection to this port 10G Ethernet link status Green On The corresponding port connection normal Off there is no connection to this port MGMT 10 100 1000BT Ethernet link status Green On The corresponding port connection r...

Page 4: ...r Ethernet device The following table shows the LED description LED LED color Description PWR Yellow On Power supply is normal Off The power is off or it is abnormal LINE Green On G hn port connection normal Off This G hn port is not connected GE Green On GE port is connected Off GE port is not connected Blink GE port Data is transmitting sending receiving 2 2 2 Physical and Environmental Dimensio...

Page 5: ...rack mount cage nuts 4 rubber feet 4 wall mount plastic nuts 4 wall mount screws 1 RS 232 serial console cable 1 power cord 3 2 Mounting Procedures 3 2 1 Front Mounting on a Standard 19 Rack a Using eight bracket screws to fix the mounting brackets on left and right sides close to the front faceplate of G4200C four bracket screws on each side ...

Page 6: ... two mounting screws on each side c If there is no screw hole on the rack rail and the holes on the rack rail are square first insert the cage nuts to the proper holes on the rail from the far side then install the rack mount screws through the holes of the mounting bracket onto the cage nuts to mount G4200C to the rack two mounting screws on each side ...

Page 7: ...6 ...

Page 8: ...nting brackets on left and right sides close to the back side of G4200C four bracket screws on each side b If there are screw holes on the rack rail direct install the rack mount screws through the holes of the mounting bracket to mount G4200C to the rack two mounting screws on each side ...

Page 9: ... on the rack rail are square first insert the cage nuts to the proper holes on the rail from the far side then install the rack mount screws through the holes of the mounting bracket onto the cage nuts to mount G4200C to the rack two mounting screws on each side ...

Page 10: ...n left and right sides close to the front faceplate of G4200C four bracket screws on each side b Using 8mm or 3 8 drill tip to drill four holes on the wall with the pattern below c Nail in four wall mount plastic nuts into four drill holes then mount G4200C on the wall with four wall mount screws ...

Page 11: ...Wall a Using eight bracket screws to fix the mounting brackets on left and right sides close to the back side of G4200C four bracket screws on each side b Using 8mm or 3 8 drill tip to drill four holes on the wall with the pattern below ...

Page 12: ...wall mount plastic nuts into four drill holes then mount G4200C on the wall with four wall mount screws 3 3 Connecting Fiber and Coaxial a Remove the dust cover on the SFP cage b Insert SFP transceiver into the SFP cage ...

Page 13: ...coaxial cable to the G hn port s respectively 3 4 Connecting Power After G4200C has been mounted either on a rack or on the wall and the optical fiber and coaxial cable have been connected properly please follow the procedures below to power up the system ...

Page 14: ... power core clip toward the power switch 2 Plug in the power cord onto power connector then press down the power core clip 3 Insert the power core to power outlet 4 Switch on the power on the power outlet and on G4200C ...

Page 15: ...ct the fiber to the SFP SFP module Step 2 Connect to downlink coaxial cable to the G hn port Step 3 Insert power cord and turn on the power switch The power LED will turn yellow G hn port green LEDs will be on shortly and then off The SYS green LED on the headend switch will turn on within one minute If the remote clients are connected and on the LEDs on the G hn ports will be on 5 2 G4201C G4204C...

Page 16: ...browse http 192 168 0 252 input username and password to login WEB interface of G4200C as following 6 1 Change IP You can configure IP address for G4200C via WEB interface Click VLAN Management VLAN Interface from the left menu to configure IP address as following 6 2 Change Device Time You can change system time through the path Administration SNTP ...

Page 17: ...n Otherwise configuration will be lost once the device is power down or reboot 6 4 Check Device Basic Information You can check device basic information through the path System Information Basic Information 6 5 Check Link Status between Local Device and Remote Device You can click System Information Node Summary from left menu to check the G hn information as following ...

Page 18: ...17 6 6 Check System Logs You can check system logs through Administration System Logs System Logs ...

Reviews: