Be sure to locate the heater such that the exhaust vent and intake piping can be routed through the building and properly terminated.
Different vent terminals can be used to simplify and eliminate multiple penetrations in the building structure (refer to the Venting
Section). The exhaust vent and intake piping lengths, routing and termination methods must all comply with the methods and limits
given in the Venting section, Part 5 of this manual.
When installing a combustion air intake from outdoors, care must be taken to utilize uncontaminated combustion air.
NOTE: To
prevent combustion air contamination, see Table 1
: Contaminant Table.
Take extra precaution to adequately support the weight of vent pipes terminating through the roof. Failure to properly support roof
terminated vent piping could result in property damage, serious personal injury, or death due to flue gas leakage.
Summary of Contents for UGC120S-100
Page 36: ...36 GI IM048En 1013 Figure 18 LP LP ...
Page 39: ...39 GI IM048En 1013 D INTERNAL WIRING DIAGRAM Figure 21 Wiring Diagram LP ...
Page 40: ...40 GI IM048En 1013 Figure 22 LP 179 L LP ...
Page 49: ...49 GI IM048En 1013 Figure 26 LP 179 J LP ...
Page 50: ...50 GI IM048En 1013 Figure 27 LP 179 H LP ...