
EnergyPak Plus
INSTALLATION & USER MANUAL
5 / 8
Connect the connector plug of the EnergyPak Plus to the charge port of the bike.
Make sure to firmly press the connector plug completely into the charge port, to ensure
proper contact and avoid moisture from entering.
Wrap and secure the Cable strap (VIII.) around the EnergyPak Plus cable and the frame.
It is recommended to place the buckle of the strap on the bottom of the frame. Check and
make sure the cable or strap does not interfere with the crank rotation.
With everything properly installed, the EnergyPak is ready for use.
STEP 6
STEP 7
Double check to see if it is properly secured in place.
STEP 3
Secure the retaining lever with a T25 Torx key. Tighten it “hand-tight” (about 2-4 N•m)
STEP 5
Slide the front side of the EnergyPak Plus onto the top pillar of the baseplate, until the lock
mechanism fully engages.
STEP 2
Gently slide the backside of the EnergyPak Plus onto the lower pillar of the baseplate fully
until it can’t go further.
STEP 1
Close the retaining lever on the opposite side of the EnergyPak plus.
STEP 4
8. ENERGYPAK PLUS INSTALLATION
Placing the EnergyPak Plus on the bike: