
33
P U L L - T O - O P E N
© G h o s t C o n t r o l s 2 0 1 9
E. DIP #4 DUAL (BI-PARTING) GATE OPENING SEQUENCE. The gate opening sequence for dual
gate opener systems only is determined by DIP#4.
This DIP switch does not apply to single gate opener
installations
NOTE
The SECOND arm will always CLOSE first before the FIRST arm.
DIP Switch # OFF Position
ON Position
4
Delay Open (Factory Default):
FIRST arm will open before the
SECOND arm.
Simultaneous Open: Both the FIRST arm and the SECOND arm will
simultaneously OPEN.
If Gate Lock is installed, the system will ignore this DIP switch
setting and default to delay open on the SECOND arm.
TURN CONTROL BOX ON. YOU SHOULD HEAR A SERIES OF BEEPS AS THE SYSTEM
IS TURNED ON
STEP 11. Locate the jog buttons at the top right of control box to test the arm and connections.
ARM EXTENDED
OUT 3-4 INCHES
Summary of Contents for DEP2
Page 6: ...6 B L A N K P A G E ...
Page 8: ...8 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 9 ...
Page 12: ...12 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 9 ...
Page 18: ...18 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 8 ...
Page 22: ...22 B L A N K G h o s t C o n t r o l s 2 0 1 9 ...
Page 64: ...64 B L A N K P A G E G h o s t C o n t r o l s 2 0 1 9 ...
Page 69: ......
Page 70: ......