22
1.
Important information
1.1 Scope of delivery
The delivery of powered foam removal and peeling tool comprises:
•
Tool d32 – d63, including components and case
•
Instruction manual COOL-FIT 2.0/4.0 – Powered Foam Removal and Peeling Tool
d32, d40, d50, d63
1.2 Documentation
The following documents are part of the product and must be considered:
•
GF Planning Fundamentals Industry
The document can be obtained via your local GF Piping Systems representative or un-
der www.gfps.com
1.3 Signs and symbols
Symbol
Meaning
>
Action required
Perform visual check (e.g. of pipes)
Use force/pressure
Do not use force/pressure
i
Notice
2.
Safety
The assembly instructions are part of the GF product and must be read carefully before
assembly. The assembly instructions must be available at all times.
2.1 Intended use
The powered foam removal and peeling tool is appointed to dismantle and peel
GF COOL-FIT 2.0/4.0 pipes.
2.2 Target group and qualification
The powered foam removal and peeling tool may only be used by professionals who are
trained regularly in work safety and environmental protection on pressurized piping
systems, and who are trained using the powered foam removal and peeling tool.
EN
Summary of Contents for COOL-FIT 2.0
Page 2: ...2 ...
Page 4: ...4 ...
Page 10: ...10 5 Vorbereitung 5 1 Rohr vorbereiten 1 2 3 DE ...
Page 11: ...11 5 2 Werkzeug einspannen 1 50 550 1 min 12 Nm 2 3 1 2 4 5 DE ...
Page 12: ...12 6 Abisolierung 6 1 Schaum trennen 1 2 2 4 5 DE ...
Page 13: ...13 6 2 Rohr schälen 1 2 2 3 5 DE ...
Page 14: ...14 6 3 Mantelrohr trennen 1 2 1 2 2 3 3 4 1 2 3 5 6 DE ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 26: ...26 5 Preparation 5 1 Pipe 1 2 3 EN ...
Page 27: ...27 5 2 Tool 1 50 550 1 min 12 Nm 2 3 1 2 4 5 EN ...
Page 28: ...28 6 Removal of insulation 6 1 Separating foam 1 2 2 4 EN ...
Page 29: ...29 6 2 Peeling pipe 1 2 2 3 5 EN ...
Page 30: ...30 6 3 Cutting jacket 1 2 1 2 2 3 3 4 1 2 3 5 6 EN ...
Page 35: ...35 ...