TS 5000 L-E-ISM VPK
Mounting and fixing
GB 4
X
Mark out and drill fixing holes for door closer and guide rail using fitting template or cut M5 thread, if necessary.
X
Drill additional hole (A) for power supply 24V DC.
In case this product is in use with an hold-open device, please observe the document “Instructions for Installati-
on, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC” as well.
CAUTION!
Damage to leaf!
X
Limit the maximal angle of aperture by means of door stop.
6.2 Mounting guide rails and covers
Fig.: 6.2.1
X
Remove 24 V fixed-leaf cable of the electrical hold-open device sideways from fixed-leaf guide rail (
1.
).
X
Align spacers at the moving and fixed leaf guide rails (
2.
).
X
Slide on adjustment pieces (
3.
) (ensure that the position is correct! Thread points towards hinge moving-leaf end).
X
Screw in regulating screw into adjustment piece on GF end (
4.
).
X
Fix guide rails in place (tightening torque: 2 Nm) (
5.
)
X
Screw down cover at moving leaf (tightening torque: 2 Nm) (
6.
).
X
Slide on end cap at fixed leaf (
7.
).
X
Insert cable fitting into GF cover and screw it tight with nut (
8.
).
X
Fix door closer (
9.
).
All screwing torques are to be adjusted on site, if necessary.
6.3 Preparation of electrical connection
X
Mount 2 x spacers (
1.
) and board (
2.
).
Fig.: 6.3.1
Summary of Contents for TS 5000 L-E-ISM VPK
Page 27: ...TS 5000 L E ISM VPK ...
Page 28: ......