background image

Powerdrive PL-HT KIT

8

Pre-installation

Pre-installation

The up-to-date drive drawing is applicable for the pre-installation work to be carried out. All components must 

be identified and installed in accordance with the drive drawing.

5.1  Cutting the track to size

 

X

Check profiles for damage.

 

X

Cut the track (Pos. 8 in the assembly group list, Chapter 4.5) to the required length (see processing drawings, 

Chapter 4.1).

 

X

Check whether additional bore holes are necessary (see production drawing for track made to measure, 

Chapter 4.1).

 

X

Clean the track after processing.

5.2  Preparing the track

 

X

Push sliding blocks (4) and earth connectors (3) into the mounting groove in accordance with the drive diagram.

 

X

Screw the device flat plug (2) to the earth connector (3) using the slotted pan head screw M4 × 6 (1) (torqu

3.5 Nm).

Summary of Contents for Powerdrive PL-HT

Page 1: ...Powerdrive PL HT KIT EN Pre installation instructions VP 190485 00 ...

Page 2: ...6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit Powerdrive PL HT 7 5 Pre installation 8 5 1 Cutting the track to size 8 5 2 Preparing the track 8 5 3 Installing stop buffers 9 5 4 Connecting the contact on the toothed belt lock optional 9 5 5 Installing the drive components 10 5 6 Connecting transformer and control unit 11 5 7 Connecting drive motor and control uni...

Page 3: ...for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 00 valid for PL HT Kit from date of manufacture 2019 1 3 Product liability In compliance with the liability of the manufacturer for his products as defined in the German Product Liability Act compliance with the information contained in this broc...

Page 4: ...rect maintenance have taken place à à The relevant accident prevention regulations and other generally recognised safety related or health safety rules must be kept à à Only original accessories original spare parts and accessories approved by GEZE guarantee problem free function of the door system à à The mandatory installation maintenance and repair work must be performed by properly trained per...

Page 5: ...en when discon nected from the mains à à Always use insulated wire end ferrules for wire cores à à Danger of injury with opened drive Hair clothing cables etc can be drawn in by rotating parts à à Danger of injury caused by unsecured crushing impact drawing in or shearing spots à à Danger of injury due to sharp edges on the drive à à Danger of injury during installation through freely moving parts...

Page 6: ...2 0235 Component drawing Suspension profile leaf PL HT 70722 2 0253 Component drawing Suspension profile leaf HPL WOOD PL HT 70722 2 0237 Production drawing Frame right with floor guide 70722 2 0238 Production drawing Frame left with floor guide 70723 2 0239 Production drawing Floor guide profile right 707023 2 0240 Production drawing Floor guide profile left 707023 2 0250 Production drawing Carri...

Page 7: ... slide to open 1 leaf left hand slide to open 4 5 Bill of material VP Kit Powerdrive PL HT 1 Transformer earthing 2 Transformer 3 Toothed belt 4 Cable holder 5 Control unit 6 Rechargeable battery 7 Gear motor 8 Track 9 Stop buffer 10 Ramp 11 Guide roller 12 Transformer cable 13 Driver 14 Return pulley Div clear adhesive labels Accessories attachment drive compo nents Accessories for cable fastenin...

Page 8: ...track Pos 8 in the assembly group list Chapter 4 5 to the required length see processing drawings Chapter 4 1 X X Check whether additional bore holes are necessary see production drawing for track made to measure Chapter 4 1 X X Clean the track after processing 5 2 Preparing the track X X Push sliding blocks 4 and earth connectors 3 into the mounting groove in accordance with the drive diagram X X...

Page 9: ...lightly 5 4 Connecting the contact on the toothed belt lock optional X X Only insert the locking pin 1 in again after the cover has been set in place X X Place the alarm contact switch 3 on the feed back switch 2 X X Fix both switches in place on the locking mechanism using M2 3 x 18 4 screw and spring washer X X Connect cable X X Shorten the switching flag of the alarm contact switch ...

Page 10: ...065 mm Legend AL Length of drive L Running track length ÖW Opening width LR Ramp length AR Ramp gap FB Leaf width FH Leaf height Z Length of toothed belt Vrs Extension left Vls Extension right When the drive is extended Vls Vrs the positions of the components must be adapted accordingly X X Install the components with the screws provided in accordance with the drawing à à Torque for components whi...

Page 11: ...nsformer to the control unit 3 to size X X Fit wire end ferrules to the transformer cable 1 X X Note earthing connection X X Do not mix up wires X X If necessary shorten and strip cable 1 attach insulated wire end ferrules and connect to the connector 2 see wiring diagram X X Connect the connector 2 to the control unit 3 5 7 Connecting drive motor and control unit X X Route the rotary transducer c...

Page 12: ... Lay cable to the locking mechanism shorten if necessary strip and attach insulated wire end ferrules X X Connect cable to locking mechanism 2 see wiring diagram X X Place cover 3 on control unit and lock in place The retention force of the cover can be increased by slightly bending the cover X X When positioning the cover do not trap any cables ...

Page 13: ...d in the door leaves can move unexpectedly X X Make sure that the rechargeable battery cable is not plugged into the control unit The rechargeable battery is not connected to the control until the production test Chapter 5 12 or during com missioning X X Check whether the rechargeable battery cable 1 is long enough X X If necessary plug the rechargeable battery extension cable to the rechargeable ...

Page 14: ...ng X X Slide the earthing rail 1 to its final position X X Tighten 2 Allen screws 2 torque 5 Nm X X Connect the earthing cable 3 from the trans former to the device flat plug 4 5 11 Testing cover earthing on site X X Make sure that there is a cover earthing on the cover on site ...

Page 15: ...ian X X Carry out mains connection and earth conductor test in accordance with VDE 0100 Part 610 X X Carry out the production test as described in the wiring diagram Automatic sliding doors DCU1 NT DCU1 2M NT 5 13 Unplugging the cables X X Unplug the rechargeable battery cable transformer cable 1 Chapter 5 6 and locking cable optional 1 Chapter 5 8 on the control unit X X Wind up the cables and fi...

Page 16: ...ance fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india geze com www geze in Italy GEZE Italia S r l E Mail italia it geze com www geze it GEZE Engineering Roma S r l E Mail italia it geze com www geze it Korea GEZE Korea Ltd E Mail info kr geze com...

Reviews: