34
Operation
Do not work on the equipment while it is operating.
After operation
Removing external dirt deposits
To remove dirt deposits rinse the equipment
with fresh water and wipe it with a clean, lint-
free cloth.
To remove any persistent residues use a
cleaning agent that is suitable for the material
and carefully wipe the equipment with a clean,
lint-free cloth.
Maintaining the equipment
For work on the equipment you will need the
following tools:
Torque spanner (US: wrench) 4-40 Nm
Torque spanner (US: wrench) 20-120 Nm
2 Spanners A. F. 8 mm
2 Spanners A. F. 19 mm (TK 23) or 24 mm (TK
24)
Screwdriver 6 mm
Screwdriver 10 mm
Cleaning the equipment
Check the equipment at regular intervals for
contamination. The intervals depend on the amount
of dirt in the system. The operator must determine
the maintenance intervals.
Normally you do not have to clean the internal parts
of the equipment.
To clean the equipment completely take off the
cover and remove the control unit.
To remove dirt deposits rinse the equipment
with fresh water and wipe it with a clean, lint-
free cloth.
To remove any persistent residues use a
cleaning agent that is suitable for the material
and carefully wipe the equipment with a clean,
lint-free cloth.
Remove any parts that are dirty and cannot be
cleaned properly.
Removing cover of equipment with DN 50
DANGER
Personnel working on pipes are exposed to
safety risks and may suffer severe injuries,
poisoning or even loss of life.
Make sure that no hot or hazardous
fluid is in the equipment or the pipes.
Make sure that the pipes upstream
and downstream of the equipment are
depressurised.
Make sure that the installation is
switched off and protected against
unauthorised or unintended activation.
Make sure that the equipment and the
pipes have cooled down to room
temperatures.
Wear protective clothing that is
suitable for the fluid and, if necessary,
wear protective gear.
For more information on suitable protective clothing
and safety gear refer to the safety data sheet of the
fluid in question.
Make sure that the equipment is depressurized,
cooled down to room temperature and free from
fluid.