Installation
- continued -
Example of Installation
Three-way valve
Overboard line
To bilge
To bilge
Pressure
maintaining
valve
(if required)
Mount
vacuum
breaker
above
the oil
separator
0x mm
copper or stainless steel pipe
Inlet
Outlet
To
bilge
Separator
Separator
outlet
Clear water
inlet (water
pressure
≥ 2.5 bar)
Fig. 3
Summary of Contents for OR 52-7
Page 15: ...15 Functional Elements Measuring sensor ORG 12 Measuring transducer ORT 7 Fig 6 p n m o 9 e q ...
Page 32: ...32 Annex Type approval certificate ...
Page 33: ...33 Annex continued Type approval certificate continued ...
Page 34: ...34 Annex continued Type approval certificate continued ...
Page 35: ...35 Annex continued Type approval certificate continued ...
Page 36: ...36 Annex continued EC Prototype Test Certificate module B ...
Page 37: ...37 Annex continued EC Prototype Test Certificate module B continued ...
Page 38: ...38 Annex continued EC Type Examination Module B Certificate ...
Page 39: ...39 Annex continued EC Type Examination Module B Certificate continued ...
Page 40: ...40 Annex continued Declaration of Conformity ...
Page 41: ...41 For your notes ...
Page 42: ...42 For your notes ...
Page 43: ...43 For your notes ...