17
Setting the bleed flow
On delivery, the bleed flow setting screw is set in
such a way that the double cone is not lifted.
To set a higher bleed flow, proceed as follows:
Turn the adjusting key (21) anticlockwise as far
as it will go.
The double cone is closed. No bleed flow is present.
The pressure gauge displays the upstream pressure
of the equipment.
Turn the setting screw (7) clockwise until the
pressure gauge indicates a drop in pressure.
The double cone is now lifted slightly.
Continue to turn the setting screw to set the
desired bleed flow.
As a rule, no more than a quarter to a half turn is
required. A full rotation lifts the double cone by
approx. 1.2 mm.
Set the outlet temperature as described on
page 15.
After operation
DANGER
If fluid escapes personnel may suffer
severe injuries, poisoning or even loss of
life.
After working on the equipment make
sure that all connections and valves
are tight.
Make sure that the gaskets of the
body are leakproof.
DANGER
Personnel working on pipes are exposed to
safety risks and may suffer severe injuries,
poisoning or even loss of life.
Make sure that no hot or hazardous
fluid is in the equipment or the pipes.
Make sure that the pipes upstream
and downstream of the equipment are
depressurised.
Make sure that the installation is
switched off and protected against
unauthorised or unintended activation.
Make sure that the equipment and the
pipes have cooled down to room
temperatures.
Wear protective clothing that is
suitable for the fluid and, if necessary,
wear protective gear.
For more information on suitable protective clothing
and safety gear refer to the safety data sheet of the
fluid in question.
When the equipment is closed, the higher-level
system parts are under operating pressure. To let
off pressure, proceed as follows:
Block off the supply lines to the equipment.
Summary of Contents for Gestramat CW 41
Page 21: ...21 Spare parts for CW 41 4 ...
Page 34: ...34 MCW 41 and MCW 41 4 ...
Page 38: ...38 ...
Page 39: ...39 ...