16
PRELIMINARI - PRE-INSTALLATION INFORMATION - PRÉALABLES - VORBEREITUNG -
PRELIMINARES - ПРЕДВАРИТЕЛЬНАЯ ПОДГОТОВКА - ΠΡΟΕΡΓΑΣΙΕΣ -
引言
DATA FOR THE ELECTRICAL SYSTEM
B - SHOWER HEAD CONTROL UNIT
•
Install in the safety zone: Z1
•
Power: 24 W
•
Input: 12 V dc, 2 A (max)
•
Output:
1. LED: RGB+WW IP67 12V dc potenza 5 W (max)
•
Service temperature: 0°C÷50°C
•
Protection: IP66
C - POWER SUPPLY (can be ordered as come optional)
•
Install in the safety zone: Z3
•
Input: 100-240 V ac, 0.59÷0.29 A, 50÷60 Hz
•
Output: 12 V dc, 2 A (max)
•
Standard: EN60950-1
ELECTRICAL CONNECTIONS DATA
•
Connection between B-C
Length max = 8 m
Poles = 2
Section = 20-22 AWG
•
Connection between A-B1
Length max (Supplied) = 5 m
A
B1
GREEN WIRE
Contact no. 1
RED WIRE
Contact no. 2
BLACK WIRE
Contact no. 3
WHITE WIRE
Contact no. 4
BROWN WIRE
Contact no. 5
YELLOW WIRE
Contact no. 7
•
Connection between A-B2
Length max (Supplied) = 5 m
A
B2
NOTES
BLUE WIRE
Contact no. 1
PINK WIRE
Contact no. 2
GREEN WIRE
Contact no. 3
GREY WIRE
Contact no. 4
Cold white LED
WHITE WIRE
Warm white LED
GREY+WHITE WIRE
Intermediate white LED
BROWN WIRE
Contact no. 5
NOTE:
- connection to a circuit breaker with tripping current no higher than 30mA is mandatory.
- on the "A-B1" and "A-B2” power supply cable, the ferrite (supplied) must be positioned near the
connector in order to comply with Electromagnetic Compatibility requirements.