background image

P.28

P.29

Installation (

Note : Make sure the power is disconnected before installation.)

Press 

Button

Safety 

Bracket

Note:

Ensure the Kneading Blade is fully inserted, 

wiggle the Kneading Blade gently for easy 

insertion.
Please note the press button is in the direction 

of the extrusion nozzle when inserting the slat. 

Ensure the slat is fully inserted.

Note:

●  Connect the extrusion nozzle to the extrusion rod according to the direction of arrow.

●  Ensure the locking collar is screwed on tightly.

●  The safety bracket must be fastened to the top cover, otherwise the appliance will not operate.

4. The Kneading Chamber has three protrusions on the bottom. Map them to the corresponding 

positions on the Main Unit.

5. Insert the Kneading Blade and Slat into the Kneading Chamber, close the top cover.

6. Pull the Safety Bracket to the top and ensure the top cover is securely fastened.

4

5

6

Installation (

Note : Make sure the power is disconnected before installation.)

Nozzle Facing Down

1. After unpacking, place the noodle maker and all the accessories on a stable and level surface.

2. Plug in the Extrusion Box and rotate 45° until it is securely locked.

3. Screw the Extrusion Rod into the Extrusion Box. Connect the Nozzle with the Extrusion Rod. 

Screw on the Locking Collar.

1

2

3

Operating Instructions

Operating Instructions

Summary of Contents for PAM-281

Page 1: ...tomatic Dough and Noodle Maker PAM 281 Please read these instructions and warranty information carefully before use and keep them handy for future reference Online Warranty Registration U S E R M A N...

Page 2: ...P 2 P 3 3 4 5 6 9 11 11 12 12 35 1 2 8 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 20 20 21 22 23 24 25 26...

Page 3: ...P 4 P 5 1 2 3 4 5 6 7 8 9 10 11 12 13 13 1 5 2 4 3 12 11 10 9 8 7 6 1 1 6 1 1 1 1 1...

Page 4: ...P 6 P 7 1 4 2 45 45 5 3 6 1 4 2 5 3 6...

Page 5: ...P 8 P 9 1 2 3 4 5 5 6 5g 5ml 2 0 0 g...

Page 6: ...P 10 P 11 7 8 9 10 11 12 20 20 1 2 1 2 20 30 E0 1 2 3 4 5 6 200g 110ml...

Page 7: ...P 12 P 13 www germanpool com PAM 281 220V 240V 50 60Hz 180W H 360mm W 150mm D 300mm 4 2kg GB4706 1 2005 GB4706 30 2008 AC220 240V 50 60Hz 14 15 16 17 21 22 22 23 23 35...

Page 8: ...P 14 P 15 1 2 3 4 5 6 7 8 9 10 11 12 13 13 1 5 2 4 3 12 11 10 9 8 7 6 1 1 6 1 1 1 1 1 1 2 8 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 20 20 21 22 23 24 25 26...

Page 9: ...P 16 P 17 1 2 45 45 3 1 2 3...

Page 10: ...P 18 P 19 4 5 6 4 5 6...

Page 11: ...P 20 P 21 7 8 9 10 11 12 20 20 200g 110ml 1 2 3 4 5 5 6 5g 5ml 2 0 0 g...

Page 12: ...P 22 P 23 1 2 1 2 20 30 E0 www germanpool com PAM 281 220V 50Hz 180W H 360mm W 150mm D 300mm 4 2kg GB4706 1 2005 GB4706 30 2008 CCC AC220V 50Hz 1 2 3 4 5 6...

Page 13: ...function or damages stop operation immediately and contact customer service or service centre for repair 11 Before operation make sure the appliance has been properly assembled 12 Switch off the appli...

Page 14: ...it 7 Control Panel 8 Unlock Button 9 Safety Bracket 10 Kneading Chamber 11 Kneading Blade 12 Top Cover 13 Slat 13 1 5 2 4 3 12 11 10 9 8 7 6 Main Unit Name Flour Measuring Cup Water Measuring Cup Nozz...

Page 15: ...he appliance will not operate 4 The Kneading Chamber has three protrusions on the bottom Map them to the corresponding positions on the Main Unit 5 Insert the Kneading Blade and Slat into the Kneading...

Page 16: ...ice e g tomato spinach juice etc or eggs to the water Mix well and pour into the kneading chamber Do not open the top cover during the kneading process Add Water 2 0 0 g Make sure the power supply is...

Page 17: ...r content flour and water ratio is subjected to adjustment Extrusion Operating Instructions Note If the problem persists please contact our customer service or repair centre Troubleshooting Care Maint...

Page 18: ...anpool com cn 86 400 830 3838 86 0757 2336 0284 repairs germanpool com cn 86 400 830 3838 China Customer Service Hotline Under normal operations the product will receive a 1 year full warrently provid...

Page 19: ...13 Newport Centre Phase II 116 Ma Tau Kok Road Tokwawan Kowloon Hong Kong 3 F Takshun Plaza Nanguo East Road Shunde Foshan Guangdong 3 F Edificio Industrial Pou Fung 145 Rua de Francisco Xavier Pereir...

Reviews: