![Gerhardt Vapodest 30 Instruction Manual Download Page 26](http://html1.mh-extra.com/html/gerhardt/vapodest-30/vapodest-30_instruction-manual_2216390026.webp)
C. Gerhardt GmbH & Co. KG
26
VAPODEST 30
8
Maintenance
In case of necessary replacements, please make sure that only
original C. Gerhardt spare parts are used!
Tubing diagram
The pumps and the valves of the instrument are marked with refe-
rence numbers.
Descriptions of the structural components (rear - interior of instru-
ment):
1 .... PVC-pipe 6x1 mm, 400 mm
2 .... PVC-pipe 10x1 mm, 400 mm
3 .... PVC-tubing 4/7 mm
4 .... Verprene tubing 4/8 mm
5 .... Peristaltic pump suction (pos.4)
6 .... Diaphragm pump NaOH (pos. 6)
7 .... Diaphragm pump H
2
O sample (pos.2)
8 .... Diaphragm pump H
2
O steam generator (pos. 5 )
9 .... Silicone tubing 4/7 mm
10 .... Tubing reduction PP 51x10x5 mm
11 .... Verprene tubing 8/12 mm
12 .... Inlet condenser, Silicone tubing 8/16
13 .... Outlet condenser, Silicone tubing 8/16
14 .... Ventilation glass
15 .... Pinch-solenoid valve, shut-off (pos. 3)
16 .... Pinch-solenoid valve, steam(pos. 7)
17 .... Novoprene-tubing 4,8x1,6 mm
18 .... PP-distributor with PP-thread
19 .... PTFE-inlet tubing NaOH
20 .... Steam generator
21 .... Water inlet tubing 10/17 mm
22 .... Magnetic valve cooling water (Pos. 8)
23 .... Outlet tubing, PVC 8/12 mm
24 .... PVC-tubing 8/12 mm
25 .... Verprene tubing 8/12 mm
26 .... Level detector for sample waste tank
27 .... knurled knob with socket
28 .... Level detector for chemical tanks
Summary of Contents for Vapodest 30
Page 31: ...C Gerhardt GmbH Co KG 31...