Installation
4
Assembly and installation
Setup
Please observe the local water and waste regulations and those
of your public water supply enterprise!
Please note that the length of the inlet and outlet tubing is restric-
ted to 2 metres.
The appliance should be located on a fixed laboratory bench, close
to the cold water connection and a drain.
There should be sufficient space for the set of tanks below the
work bench.
Connect the water inlet tubing to a dedicated cold water tap.
The water pressure must be at least 1,3 bar in order to operate the
integrated pressure controller.
The Vapodest 30 comes completely preassembled. Please un-
pack the instrument with care!
1. Place instrument on work bench
2. Unpack accessories.
3. Place set of tanks for distilled water, sodium hydroxide and
sample waste below the bench.
Make sure that the set of tanks are not placed any higher than the
distillation unit!
4. Connect the pump tubes (connections are marked at the rear
of the apparatus) to the PVC-pipes of the chemical tanks:
–
Inlet tubing sodium hydroxide (PVC-tubing 8/12 mm)
–
Inlet tubing for distilled water steam generator
(PVC-tubing 4/7 mm)
–
Inlet tubing for distilled water sample (PVC-tubing 4/7)
5. Connect the water inlet tubing
-
Connect water inlet tubing (pressure-proof tissue tubing
10/17 mm) to cooling water inlet and laboratory water supply
INSTALLATION
Tubing
connections
Summary of Contents for Vapodest 30
Page 31: ...C Gerhardt GmbH Co KG 31...