C. Gerhardt GmbH & Co. KG
11
Installation
4
Assembly and installation
Setup
Please observe the local water and waste regulations and those
of your public water supply enterprise!
Please note that the length of the inlet and outlet tubing is restric-
ted to 2 metres.
The appliance should be located on a fixed laboratory bench,
close to the cold water connection and a drain.
There should be sufficient space for the set of tanks below the
work bench.
Connect the water inlet tubing to a dedicated cold water tap.
The water pressure must be at least 0,5 bar in order to operate
the integrated pressure controller.
The Vapodest 20 comes completely preassembled. Please un-
pack the instrument with care!
1.
Place instrument on work bench
2.
Unpack accessories.
3.
Place set of tanks for distilled water and sodium hydroxide
below the bench.
Make sure that the set of tanks are not placed any higher than the
distillation unit!
4.
Connect the pump tubes (connections are marked at the rear
of the apparatus) to the PVC-pipes of the chemical tanks:
–
Inlet tubing sodium hydroxide (PVC-tubing 8/12 mm)
–
Inlet tubing for distilled water steam generator
(PVC-tubing 4/7 mm)
5.
Connect the water inlet tubing
-
Connect water inlet tubing (pressure-proof tissue tubing
10/17 mm) to cooling water inlet and laboratory water supply
INSTALLATION
Tubing
connections