
Getting Started
13
3
3.2
Turning on the Power
Once the above hardware is properly connected, it is the time to turn on the GV-Hot Swap
Surveillance System V6. To turn on the power, follow these steps:
1. Turn on the monitor.
Power On
Figure 3-2
2. For 4U (20 bay) models, turn on the AC power switch on the rear panel first.
4U (20-Bay) Models
Power Switch
Figure 3-3
(
Note:
The figure of 4U model is for reference only; the rear panel may vary due to product
enhancement.)
3. Turn on the main power switch on the front panel.
Power Button
Figure 3-4