3.2. Unpacking
Carefully unpack the UPS, then carefully locate the UPS onto the site which has
selected, with all the points in section 3.1 kept in mind.
The UPS has had detailed production and QC testing of all the electrical and
mechanical characteristics prior to shipment from the factory. Therefore, the UPS
should be in proper condition upon receipt. Once received, the UPS should be first
checked visually to determine if any physical damage has occurred during
transportation.
Then check to insure that all the accessories/options (match with your purchase order)
have been included.
- DOOR KEY
- THIS INSTRUCTION MANUAL
- BATTERY FUSE (FOR BATTERY CABINET ONLY)
- SPARE SCREWS FOR COVER PLATE
- SPARE SCREWS FOR CONNECTION TERMINALS etc.
Lastly, check to insure that the specification of the UPS is identical to the
specification of your order. The key items in the specification you must check are:
- RATED POWER OF THE UPS,
- INPUT VOLTAGE & FREQUENCY
- OUTPUT VOLTAGE & FREQUENCY
- NO. OF OUTPUT PHASES (1
Φ
OR 3
Φ
)
- BATTERY VOLTAGE OR CELL NO.
Also check to insure that the necessary documentation is attached:
- GUARANTEE CARD
- AGENT/SERVICE CENTER INFORMATION
3-5
Summary of Contents for T3UPS-11-15K
Page 18: ...1 7 Dimension Drawings 10KVA 60KVA OUTLINE DRAWING 1 13...
Page 19: ...10KVA 60KVA INTERIOR DRAWING 1 14...
Page 20: ...75KVA 160KVA OUTLINE DRAWING 1 15...
Page 21: ...75KVA 160KVA INTERIOR DRAWING 1 16...
Page 22: ...175KVA 320KVA OUTLINE DRAWING 1 17...
Page 23: ...175KVA 320KVA INTERIOR DRAWING 1 18...
Page 24: ...INTER PCB DIAGRAM 1 19...
Page 31: ...1...
Page 35: ...3 3...
Page 70: ...ONE TO TWO SERIAL REDUNDANCY 8 3...
Page 77: ...Appendices Additional Data on Options UPSCOMTM UPSCALLTM DCMANTM...
Page 80: ...3...
Page 81: ......