EM31-SH
MANUAL
Page
22
4.0
SURVEY TECHNIQUE
Surveying with the EM31 is straightforward. As pointed out
in 2.1.3. measurements may be made either continuously or on
a station-by-station basis. In either case it is always
recommended, as for any other geophysical survey, that survey
lines and measurement stations be carefully laid out, and the
survey performed in a systematic fashion with the resulting
data accurately plotted for each measurement station. The
most common survey error is to have the survey lines too
short, in which case they do not extend sufficiently far off
the expected anomalous region to permit the operator to
establish the background values of terrain conductivity.
The decision as to the correct spacing will be based on a
knowledge of the lateral dimension of the anticipated
resistivity anomaly. To ensure the correct spacing, it is
useful at the start of the survey to continuously observe the
conductivity values that are encountered as the operator
moves alone the survey line.
The resolution in conductivity of the EM31 is also high, with
changes of 5% being quickly perceived. This instrument is
capable of giving an extremely precise survey with
information on small variations in the terrain.
It was seen in Section 1 that current flow within the earth
consists of a series of concentric circles, assuming that the
conductivity is laterally uniform. Therefore, in the case of
a uniform half-space, rotation of the instrument in a
horizontal plane about the transmitter coil as a pivot will
produce no change in the meter reading. Conversely, any
change in the reading as this procedure is carried out is an
indication of lateral inhomogeneities in conductivity. It is
simpler and usually sufficiently accurate for the operator to
rotate the instrument through 90° using himself as pivot
Summary of Contents for EM31-SH
Page 8: ...EM31 SH MANUAL Page 4 Table 1A Resistivities of Igneous and Metamorphic Rocks...
Page 9: ...EM31 SH MANUAL Page 5 Table 1B Resistivities of Consolidated Sediments...
Page 10: ...EM31 SH MANUAL Page 6 Table 1B cont d Resistivities of Consolidated Sediments...
Page 11: ...EM31 SH MANUAL Page 7 Table 1B cont d Resistivities of Consolidated Sediments...
Page 12: ...EM31 SH MANUAL Page 8 Table 1C Resistivities of Unconsolidated Formations...
Page 13: ...EM31 SH MANUAL Page 9 EM31 SH FRONT PANEL FEATURES...
Page 32: ...EM31 SH MANUAL Page 28 Figure 4 Multi Layer Response Diagram...
Page 41: ...EM31 SH MANUAL Page 37...
Page 42: ...EM31 SH MANUAL Page 38...
Page 43: ...EM31 SH MANUAL Page 39...
Page 44: ...EM31 SH MANUAL Page 40...
Page 45: ...EM31 SH MANUAL Page 41...
Page 46: ...EM31 SH MANUAL Page 42...
Page 47: ...EM31 SH MANUAL Page 43...
Page 48: ...EM31 SH MANUAL Page 44...
Page 49: ...EM31 SH MANUAL Page 45...