Check & Adjust
Zoom80
| 89
7.
TOOLS Adjustment Accuracy
<No.of Meas:> Shows the number of runs executed. One run
consists of a measurement in face I and face II.
<
l Comp:> and similar lines show the standard deviations of the
determined adjustment errors. The standard deviations can be calcu-
lated from the second run onwards.
It is recommended to measure at least two runs.
8.
MEAS
(F5) if more runs have to be added. Continue with step 3.
OR
CONT
(F1) to accept the measurements and to proceed to TOOLS
Adjustment Results. No more runs can be added later.
Step
Description