MODEL 8800 SERIES GEONET WIRELESS DATA HOSTING SYSTEM
| NETWORK INSTALLATION |
13
15:
FIGURE 15:
Channel Select Switches
TABLE 5:
Channel Selection
3.2
CONFIGURE THE GATEWAY
3.2.1 POWER CONCERNS
In a new network, be sure to power the gateway
before
powering the loggers.
When the unit is powered, a green LED on the right side of the box will flash
twice after a small delay, indicating the unit has power. The LEDs will not flash
again until at least one logger has joined the Network.
Note:
Deployment mode starts as soon as devices are powered on or reset. See
Section 3.7 for information on Deployment mode.
Note:
If replacing batteries in an existing network, ensure that the network is in
Deployment Mode prior to removing the batteries. See Section 4.3 for more
information on battery replacement.
3.2.2 POWER THE GATEWAY
■
Cellular Gateway 880X-XX-LTM-USB, 8800-XX-03G-USB
Move the battery switch to the
9-24V
or
BATTERY
position, according to the
chart below. Connect to external DC power, then proceed to Section 3.2.3.
For solar panel information, see Appendix F.
Channel
5:
1
2
3
4
1
OFF (down)
OFF
OFF
OFF
2
ON (up)
OFF
OFF
OFF
3
OFF
ON
OFF
OFF
4
ON
ON
OFF
OFF
5
OFF
OFF
ON
OFF
6
ON
OFF
ON
OFF
7
OFF
ON
ON
OFF
8
ON
ON
ON
OFF
9
OFF
OFF
OFF
ON
10
ON
OFF
OFF
ON
11
OFF
ON
OFF
ON
12
ON
ON
OFF
ON
ON = up
OFF = down