![Geobrugg GBE-1000A Product Manual Download Page 21](http://html1.mh-extra.com/html/geobrugg/gbe-1000a/gbe-1000a_product-manual_2214459021.webp)
Page 21/41
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-1000A / 16
CONCRETE:
•
Can be used for all types of soil and rock
•
Dig a hole for the concrete foundation
111
•
Drill the rear anchoring
07
; the project engineer calculates the
lengths of the anchors
•
Prepare the concrete foundation
111
; the concrete foundation
111
is
dimensioned and reinforced in accordance with the information from
the project engineer
•
Mortar in the rear anchoring
07
with the fastening nuts
10
and spac-
ers
09
•
Install both anchors
08
with the help of the base plate
29
.
Spacers
09 and fastening nuts 10 must be fixed on both sides of the
base plate
;
length of anchor
08
L = 500 mm
•
Fill in the concrete foundation
111
•
Tighten the fastening nuts
10
to approx.
30 kN pretensioning force
ROCK:
•
Remove rock around the base plate
29
at 0
– 30° to the horizontal
•
Drill holes for the anchor
08
that are vertical to the base plate
29
in-
to the rock
112
•
Mortar in the anchor
08
; the project engineer calculates the lengths
of the anchors
•
Position the base plate
29
in the levelling layer of mortar
•
Tighten the fastening nuts
10
with the spacers
09
to approx. 30 kN
pretensioning force after the mortar has fully hardened
Tightening torque of the fastening nut for an anchor pretensioning force of approx. 30 kN:
Swiss-GEWI NG 20
Swiss-GEWI NG 25
Swiss-GEWI NG 28
Swiss-GEWI NG 32
Tightening torque
200 Nm
300 Nm
400 Nm
400 Nm
You must use mortar that is resistant to both frost and de-icing salt.
Reinforcement: 12 mm rebar diameter, 150 mm apart
An installation template can be supplied on request.
Please ensure the anchors have sufficient contact with the mortar, create a good bond, and that enough of the sur-
face makes contact with the surrounding material.
You can find more information about anchoring the base plate in the anchor data sheet.
The forces that may occur in the event of a rockfall event must not be underestimated. Civil engineering and installa-
tion work must therefore be carried out by experts.
09,
10
09,
10
08
09, 10
08
29
112
09,10
07
07
29
09,10
111
Summary of Contents for GBE-1000A
Page 2: ...Page 2 41 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 1000A 16...
Page 3: ...Page 3 41 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 1000A 16...
Page 39: ...Page 39 41 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 1000A 16...
Page 40: ...Page 40 41 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 1000A 16...
Page 41: ...Page 41 41 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 1000A 16...