4.Take off the boss and driving plate.
5.Continuous Various Transmission engagement
speed inspection
Connect an electric tachometer.
Seated on the motorcycle with on level ground,
increase the engine’s speed slowly and notice the
RPM at which the motorcycle begins to move
forward.
Specified Engagement RPM : 3100
±
300 rpm
6.Clutch “LOCK-UP” inspection
Apply the rear brake as firm as possible
Briefly open the throttle fully and notice the
maximum engine RPM sustained during the test
cycle.
Specified Clutch “LOCK-UP” RPM : 5200
±
400 rpm
Summary of Contents for Blur 150
Page 1: ......
Page 2: ...Blur 150 220i Service Manual...
Page 15: ...C Chassis appearance 1 Apply oil 1 2 2 Apply grease 3 4 5 6 7 8 1 2 3 4 5 6 7 8...
Page 16: ...D Wheel bearing Final transmission mechanism gear oil Speedometer gear clean grease...
Page 46: ...1 Lubrication System...
Page 70: ...7 A C Generator A Dismantling AC generator B Installing AC generator...
Page 84: ......
Page 104: ...1 Brake pad inspection for BLUR 150...
Page 116: ...3 Recharge system A Recharge system diagram for BLUR 150...
Page 134: ...1 6 3 Electric system Carburetor model electric General maintenance Engine Management System...
Page 143: ...10 BLUR 220 Specified engine oil synthetic 1000ml...
Page 158: ...2 EMS index EMS units EMS diagnostic...
Page 159: ...3 Feature of PGO 2nd stage EMS feature 1 small light 2 integrity 3 accuracy 4 simple...
Page 162: ...6 EMS units...
Page 163: ...7 Throttle position sensor Intake pressure sensor injector Idle Speed Controller...
Page 164: ...8 FUEL PUMP COMP COIL COMP IGNITION O2 SENSOR TE SENSOR crankshaft ANGLE SENSOR...
Page 165: ...9 ECU ECU ECU ECU SAFETY SENSOR SIDE STAND AIAC ASSY SOLENOID...
Page 166: ...10 Important PIN no of ECU no of ECU no of ECU no of ECU ECU PIN 1 PIN 18 PIN 19 PIN 36 PIN...
Page 175: ...19...
Page 176: ...46 Wiring diagram for BLUR 150 4V...
Page 177: ...47 Wiring diagram for BLUR SS220I...
Page 178: ...48...
Page 179: ...49...