INSTALLATION GUIDE
Page 38
JP1 - JUMPER MUST BE INSTALLED ON PIN 2-3 = 4-20mA AND
JP2 - JUMPER MUST BE INSTALLED ON PIN 1-2 = STANDARD
IF A STATIC PRESSURE PROBE IS USED, JUMPER JP1 MUST BE SET TO
POSITION 2-3 (4-20mA). OTHERWISE, JUMPER JP1 MUST BE INSTALLED IN
POSITION 1-2 (STANDARD).
JP3 - JUMPER MUST BE INSTALLED ON PIN 1-2 = ID1 AND
JP4 - JUMPER MUST BE INSTALLED ON PIN 2-3 = 19200bps
JP1 - JUMPER MUST BE INSTALLED ON PIN 1-2 = ID1 AND
JP2 - JUMPER MUST BE INSTALLED ON PIN 1-2 = 19200bps
JP1 - JUMPER MUST BE INSTALLED ON PIN 2-3 = ID2 AND
JP2 - JUMPER MUST BE INSTALLED ON PIN 1-2 = 19200bps
JP1 - JUMPER MUST BE INSTALLED ON PIN 1-2 = ID1
JP1 - JUMPER MUST BE INSTALLED ON PIN 2-3 = ID2
REFER TO OPTI-GAIN 1 MANUAL FOR WIRING DETAILS.
REFER TO THE FEED BIN SCALE INSTALLATION MANUAL FOR MORE
DETAILS OF THE FEED BIN TRANSMITTER MODULE.
JP4 - JUMPER MUST BE INSTALLED ON PIN 1-2 = ID1 AND
JP4 - JUMPER MUST BE INSTALLED ON PIN 2-3 = ID2 FOR THE SECOND
MODULE, IF 2 MODULES ARE USED ON THE SAME PORT.
JP3 - JUMPER MUST BE INSTALLED ON PIN 2-3 = ID2 AND
JP4 - JUMPER MUST BE INSTALLED ON PIN 2-3 = 19200bps
MODULE AS ADJUSTMENT "PORT ID AND COMMUNICATION"
IN THE SETUP MENU.
FOR A LENGTH CABLE EXCEEDING 500’ (150M), INSTALLING A 120 OHMS
RESISTANCE ON THE A&B TERMINALS OF THE PORTS AT THE END OF THE
LOOP IS MANDATORY.
JP3 - JUMPER MUST BE INSTALLED ON PIN 1-2 = LEADING EDGE
JP4 - JUMPER MUST BE INSTALLED ON PIN 1-2 = LEADING EDGE
THE CURRENT SHALL NOT EXCEED 8A AT EACH OUTPUT.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Summary of Contents for iTouch GE-430i
Page 3: ...INSTALLATION GUIDE Page 3 WIRING DIAGRAM...
Page 8: ...INSTALLATION GUIDE Page 8 Wiring Diagram Sensor Comm Board X1199...
Page 9: ...INSTALLATION GUIDE Page 9 Wiring Diagram 8 Input Board X1200...
Page 10: ...INSTALLATION GUIDE Page 10 Wiring Diagram MGCB 8 Input Board X1399...
Page 11: ...INSTALLATION GUIDE Page 11 Wiring Diagram 8 Comm Port Board X1276...
Page 12: ...INSTALLATION GUIDE Page 12 Wiring Diagram Output Board X1201...
Page 13: ...INSTALLATION GUIDE Page 13 Wiring Diagram Relay Board REL 5...
Page 14: ...INSTALLATION GUIDE Page 14...
Page 15: ...INSTALLATION GUIDE Page 15 Wiring Diagram Air Inlet...
Page 16: ...INSTALLATION GUIDE Page 16 Wiring Diagram Variable Board VAR 2...
Page 17: ...INSTALLATION GUIDE Page 17 Wiring Diagram Slave Pot Board and Relay Control...
Page 18: ...INSTALLATION GUIDE Page 18 Wiring Diagram Slave Relay Board REL 5...
Page 19: ...INSTALLATION GUIDE Page 19...
Page 20: ...INSTALLATION GUIDE Page 20 Wiring Diagram Slave Variable Board VAR 2...
Page 21: ...INSTALLATION GUIDE Page 21 Wiring Diagram V4...
Page 22: ...INSTALLATION GUIDE Page 22 Wiring Diagram Optigain 1...
Page 23: ...INSTALLATION GUIDE Page 23 Typical Installation Layout FBT LIM...
Page 24: ...INSTALLATION GUIDE Page 24 Wiring Diagram FBT LIM...
Page 25: ...INSTALLATION GUIDE Page 25 Wiring Diagram MS10...
Page 26: ...INSTALLATION GUIDE Page 26 Typical Installation Layout Pig Sorters...
Page 27: ...INSTALLATION GUIDE Page 27 Wiring Diagram Pig Sorter...
Page 28: ...INSTALLATION GUIDE Page 28 Pig Sorter Board...
Page 29: ...INSTALLATION GUIDE Page 29 Wiring Diagram Weather Station...
Page 30: ...INSTALLATION GUIDE Page 30 Wiring Diagram Batch Loader...
Page 31: ...INSTALLATION GUIDE Page 31 Wiring Diagram V4 M V2 M...
Page 32: ...INSTALLATION GUIDE Page 32 Floor Scale Board...
Page 33: ...INSTALLATION GUIDE Page 33 Wiring Diagram Floor Scale...
Page 34: ...INSTALLATION GUIDE Page 34 Wiring diagram V2 LED...
Page 35: ...INSTALLATION GUIDE Page 35 Wiring diagram CDC 4...
Page 36: ...INSTALLATION GUIDE Page 36 Wiring diagram MBUS...
Page 39: ...INSTALLATION GUIDE Page 39 INSTALLATION...
Page 55: ...INSTALLATION GUIDE Page 55 INDEX WARRANTY...
Page 59: ...VER 1 3 January 7 2020...