background image

6

ENGLISH

12) Repeat the  above operations to install the second operator,

if required.

13) Install the control unit box according to the dimensions given

in the relevant instructions.

4. STARTING THE AUTOMATED UNIT

CAUTION: Before attempting any work on the system or on the
operator, always turn off power.

Observe points 10, 11, 12, 13, 14 of the GENERAL SAFETY
OBLIGATIONS.
Observing the instructions in Fig.2, lay the raceways and make
the electric connections of the control board to the selected
accessories.
Always separate power cables from control and safety cables
(push-button, receiver, photocells, etc...). To prevent any electric
noise whatever, use separate sheaths.
1)

Program the control board according to your needs observing
the concerning instructions.

2)

Switch on power to the system and check the condition of
the LEDs according to the table of the control board
instructions.

5. TESTING THE AUTOMATED UNIT

Carefully check operation of the operator and all
accessories connected to it.
Give the customer the page entitled "End-User Guide". Describe
how the operator works and explain how it is to be used correctly.
Inform the customer of the potential hazard areas of the
automation.

6. MANUAL OPERATION

In the irreversible version, the gate can be operated manually in
the event of a power failure or malfunction by removing the plug
and inserting the special release key as shown in fig. 7.
To release the operator, turn the key in the leaf closing direction
(fig. 7).
Open or close the leaves manually.

7. RETURNING TO NORMAL OPERATION

Turn off the electricity supply to the system before re-locking the
operators to avoid all risk of starting them accidentally.
To re-lock the operator, turn the key in the leaf opening direction
(fig. 7).

Fig. 7

SBLOCCA

DESBLOQUEAR

DEBLOQUE

UNLOCK

ENTRIEGELT

BLOCCA

BLOQUEAR

BLOQUE

LOCK

VERRIEGELT

SBLOCCA

DESBLOQUEAR

DEBLOQUE

UNLOCK

ENTRIEGELT

BLOCCA

BLOQUEAR

BLOQUE

LOCK

VERRIEGELT

8. SPECIAL APPLICATIONS

There are no special applications.

9. MAINTENANCE

Carry out periodic checks of the gate structure and ensure in
particular that the hinges are in perfect working condition.
Check periodically that the electronic anti-crushing system is
adjusted correctly and that the release mechanism for manual
movement is fully operative (see relevant paragraph).
Safety devices installed on the system must be checked every six
months.

10.REPAIRS

For repairs, contact authorised service centres.

Reviews: