47
Englis
h
6 Generator usage.
First uses:
In order to improve the engine operation and extend the life of the
machine, we recommend a "break-in period" of 20 hours without forcing the
generator, with charges that do not exceed 60% of the equipment's maximum
output.
WARNING:
Ensure grounding is connected (grounding Rod). Consult to
your electrician to comply with local or national regulations on ground
connections
WARNING:
Never connect the 230 voltage output of the equipment to a
building or house (not even during a power outage). The return of the main
network would clash with the generator's voltage and cause serious damage
to the equipment or even a fire.
WARNING:
Do not connect in parallel with the generators, both will be
damaged and will be a fire hazard.
NOTE:
Do not connect an extension to the exhaust.
NOTE:
If a cable extension is needed, make sure you use a good quality
rubber extension and appropriate section, consult to your electrician or
professional shops.
NOTE:
Devices that use electric motors such as compressors, water
pumps, saws, grinder, etc. require up to 3 times more power for startup. For
example, a 500 W water pump would need a 1500 W generator for startup.
Verify that charges upon connection do not exceed the maximum power of the
group according to this indication.
GROUNDING SIMBOL