P.O. Box 3547 / Johnson City, TN 37602 / 1-800-414-4661 / www.GeneralShale.com
Step
4
Install metal ring insert.
Slide the metal ring insert into the opening as shown to complete the kit.
Wait 24 hours before building a fire in your fire pit to allow for curing.
6
“Entertainer” Fire Pit (FPR-100) Assembly Instructions
Metal Ring Insert
To allow for drainage, fill the inside of fire pit with crushed stone, pea gravel
or similar to desired height (8
"
recommended).
Outdoor Living Products
Helvetica Neue LT W1G
75 Bold
9 pt
<VA> -30
OL-BRO 0010-0516