8
3.4
GENERATOR TESTS UNDER
LOAD
1. Set the generator's main circuit breaker to its OFF or OPEN
position.
2. Set the UTILITY SERVICE DISCONNECT circuit breaker to the
OFF position.
3. Manually actuate the transfer switch main contacts to
their GENERATOR (STANDBY) position. Refer to "Manual
Operation".
4. To start the generator, set the AUTO/OFF/ MANUAL switch to
MANUAL. When engine starts, let it stabilize for a few min-
utes.
5. Turn the generator's main circuit breaker to its ON or CLOSED
position. The generator now powers all LOAD circuits. Check
generator operation under load as follows:
• Turn ON electrical loads to the full rated wattage/amperage
capacity of the generator. DO NOT OVERLOAD.
• With maximum rated load applied, check voltage and fre-
quency across transfer switch terminals E1 and E2. Voltage
should be greater than 230VAC and frequency should be
greater than 59 Hertz.
• Let the generator run under rated load for at least 30 minutes.
With unit running, listen for unusual noises, vibration, over-
heating, etc., that might indicate a problem.
6. When checkout under load is complete, turn the generator's
main circuit breaker to its OFF or OPEN position.
7. Let the generator run at no-load for several minutes. Then,
shut down by setting the AUTO/OFF/MANUAL switch to its
OFF position.
8. Move the transfer switch's main contacts back to their UTIL-
ITY position. For example, LOAD connected to UTILITY power
supply. Refer to "Manual Operation". Handle and operating
lever of transfer switch should be in the UP position.
9. Turn on the utility power supply to transfer switch, using the
UTILITY SERVICE DISCONNECT circuit breaker. The utility
power source now powers the loads.
10. Set the generator's AUTO/OFF/MANUAL switch to its AUTO
position.
3.5
TESTING LOAD SHED MODULE
(LSM)
A Test pushbutton is provided on the bottom of the LSM to test the
operation of the tested functions. The Test button will work when
the ATS is in the Utility or the Generator position.
1. Turn the Utility supply on to the ATS.
2. Press the TEST pushbutton on the LSM.
3. Verify that all of the connected loads to be “shed” become
disabled. The method of verification will depend on the type
of load.
4. After 5 minutes verify the priority 1 loads are enabled. Status
LED L1 and Air 1 is ON.
5. After another 30 seconds, verify the priority 2 loads are
enabled. Status LED L2 and Air 2 is ON.
6. After another 30 seconds, verify the priority 3 loads are
enabled. Status LED L3 is ON.
7. After another 30 seconds, verify the priority 4 loads are
enabled. Status LED L4 is ON.
Operation
Summary of Contents for RTS automatic
Page 1: ...This manual should remain with the unit Technical Manual RTS Automatic Transfer Switch...
Page 11: ...9 9 Notes...
Page 12: ...10 Notes...
Page 13: ...11 100A SE non SE 150 200A non SE Installation Drawing No 0G6832 A Installation Diagrams...
Page 14: ...Installation Diagrams 150 200A SE Installation Drawing No 0H4905 A 12...
Page 15: ...13 13 Installation Drawing No 0J0814 B Installation Diagrams...
Page 16: ...14 14 Electrical Data Interconnection Drawing No 0H8676 C...
Page 17: ...15 15 Interconnection Drawing No 0H7454 C Electrical Data...
Page 18: ...16 Electrical Data Schematic Drawing No 0H7254 B...
Page 19: ...17 Schematic Drawing No 0H7254 B Electrical Data...
Page 20: ...18 Exploded Views Parts Lists 100A Assembly Drawing No 0H7264 H...
Page 22: ...20 Exploded Views Parts Lists 150A Assembly Drawing No 0J2006 D Parts List on page 22...
Page 23: ...21 150A Assembly Drawing No 0J2006 D Exploded Views Parts Lists Parts List on page 22...
Page 25: ...23 Parts List on page 25 200A Assembly Drawing No 0H7265 F Exploded Views Parts Lists...
Page 26: ...24 Parts List on page 25 Exploded Views Parts Lists 200A Assembly Drawing No 0H7265 F...
Page 28: ...Part No 0J2119 Revision B 01 06 12 Printed in U S A...
Page 29: ......
Page 31: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......