Generac Power Systems PV Link Installation Manual Download Page 17

14

Installation Manual for PV Link and SnapRS

Connecting to Inverter

See 

Figure 5-3

. Connect each PV Link output

to the REbus DC nanogrid and inverter.

Figure 5-3. Connecting PV Link Optimizer 

When connecting optimizers to the inverter:

• Do  not  reverse  the  input  and  output  or

cross-wire  polarity.  To  avoid  confusion,

complete  the  wiring  of  the  PV  Link  output

before installing PV modules.

• Do  not  connect  PV  Link  optimizers  in

series.

• Connect multiple PV Link outputs in paral

-

lel. To connect PV Links in parallel:

– Connect all negative (RE-) PV Link

outputs on a home run together.

– Connect all  positive  RE (+)  outputs

on a home run together.

• Current  adds  when  connecting  optimizers

in parallel. The maximum output current of

each PV Link is 8 A. When wiring PV Link

outputs  to  the  inverter,  observe  tempera

-

ture ratings and current-carrying capacity of

the  wire  used,  including  appropriate  NEC

derating factors. 

NOTE: 

 Multiple home-runs will be necessary

in larger systems.
• Connect  field  wiring  to  the  PV  Link  with

Staubli MC4 PV connectors only. 

• Mark positive REbus field wiring leads with

red insulation or flagging. 

• Mark negative REbus field wiring leads with

blue insulation or flagging. 

• Connect  multiple  optimizers  in  parallel,

using  MC4  branch  connectors  or  a  com

-

biner box.

Connecting PV Modules

NOTE: 

Warranty does not cover water ingress

through wiring from external connections due

to poor wiring practices. 

2014 NEC and Earlier Editions

For  NEC  2014  compliant  systems,  connect

the substring PV modules in series.

To install PV modules in series to PV Link: 

1. Connect the negative lead of the first mod

-

ule in the string to the PV Link at the loca

-

tion  marked  PV  Substring  Input  (-).  See

Component Locations

  for  PV  Input  loca

-

tion. 

2. Connect the first module’s positive lead to

the second module’s negative lead.

3. Continue connecting the substring module

leads  in  series  until  the  last  module  is

reached.

4.

Connect the positive lead of the last mod

-

ule in the  substring  to the PV Link at the

location  marked  PV  Substring  Input  (+).

See 

Component  Locations

  for  PV  input

location. 

5. Make a string map using the serial number

stickers and record in 

Table 1: PV Link and

SnapRS Important Information

 

the  follow

-

ing information:

– Each PV Link serial number

– Each PV Link RCP number

– Number of parallel strings

(000659)

Equipment damage. Connect the PV Link output to a REbus-
compatible device (± 190 VDC nominal regulated DC bus)
only. Connecting to conventional PV inverters or any other
device could cause equipment damage. 

CAUTION

010027

(000657)

Equipment damage. Never leave the PV Link MC4 
connectors open and exposed to the atmosphere overnight
or during rain. Doing so could cause equipment failure. 

CAUTION

(000661)

Equipment damage. Never connect PV Link to any other 
power source. The optimizer is designed to work with series
connected PV modules only. Connecting the optimizer to any
other power source could cause equipment damage. 

CAUTION

Summary of Contents for PV Link

Page 1: ...d in a critical life support application Failure to adhere to this warning could result in death or serious injury Register your Generac product at https pwrfleet generac com 1 888 GENERAC 888 436 372...

Page 2: ...ty to perform all safety checks to verify that all maintenance for safe operation is performed promptly and to have the equipment checked periodically by an ASD Normal maintenance service and replacem...

Page 3: ...t Locations 7 Section 3 Installation Design 9 Installation Design Worksheet 9 Section 4 PVRSS Compliance Guidelines 11 Section 5 Mounting and Connecting 13 Installation Guidelines 13 Attachment and Gr...

Page 4: ...erating technique that the manufacturer does not specifically recommend verify that it is safe for others and does not render the equipment unsafe Throughout this publication and on tags and decals af...

Page 5: ...completed PV system meets the rapid shutdown functional requirements This equip ment must be installed according to the manu facturer s installation instructions 000191 DANGER Automatic start up Disco...

Page 6: ...s injury equipment and property damage DANGER 000152 DANGER Electrocution Verify electrical system is properly grounded before applying power Failure to do so will result in death or serious injury 00...

Page 7: ...4 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 8: ...te maximum Maximum input current operating A F C 13 122 50 Maximum input current short circuit A 18 Maximum output current fault A 10 Maximum output voltage VDC 420 open circuit Nominal output REbus D...

Page 9: ...rtant Information Figure 2 1 Serial Number Location SnapRS Date of Manufacture Refer to Figure 2 2 to locate the unit date of manufacture Record this information in Table 1 PV Link and SnapRS Importan...

Page 10: ...The PV Link meets the ground fault protection requirements in NEC Article 690 41 B AFCI Information The PV Link is a Photovoltaic DC Arc Fault Circuit Protection Type 1 device that incorpo rates an in...

Page 11: ...8 Installation Manual for PV Link and SnapRS SnapRS Component Locations Figure 2 6 Component Locations A Positive PV Connector B Negative PV Connector A B 010050...

Page 12: ...ge limit 3 Divide the PV Link VMP Voltage at Maxi mum Power by the panel VMP and round down to determine the number of panels that can be connected in series to the PV Link without exceeding maximum p...

Page 13: ...10 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 14: ...eet 2017 and 2020 compliance 1 The 2017 and 2020 NEC requires the PVRSS initiator be located at a readily accessible location outside the building The DC disconnect under the PWRcell inverter cover la...

Page 15: ...12 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 16: ...TRIC SHOCK HAZARD DC OUTPUT CONDUCTORS MAY BE ENERGIZED REGARDLESS OF SUN EXPOSURE CAUTION RISK OF ELECTRIC SHOCK WHENTHE PHOTOVOLTAIC ARRAY IS EXPOSEDTO LIGHT IT SUPPLIES A DCVOLTAGETO EQUIPMENT COVE...

Page 17: ...connections due to poor wiring practices 2014 NEC and Earlier Editions For NEC 2014 compliant systems connect the substring PV modules in series To install PV modules in series to PV Link 1 Connect t...

Page 18: ...to the negative whip of the PV Module D 2 Connect the negative end of each SnapRS device to the positive whip of the next PV module in the series 3 Connect the PV string positive lead to PV Link B at...

Page 19: ...ed in parallel each string must use the same number of the same type of PV modules and there must be one SnapRS device for each module in the array Figure 5 5 Parallel Input PV Array with SnapRS Devic...

Page 20: ...ee the Generac PWRcell Inverter Installation Manual for instructions on commissioning the REbus system PVRSS Commissioning with SnapRS Devices To enable PV Link to work as a PVRSS with SnapRS devices...

Page 21: ...high input The voltage detected with SnapRS devices disabled is higher than expected Verify the SnapRS devices are installed correctly Run the PVRSS self test SnapRS devices have not been installed or...

Page 22: ...fault is detected the status message reads Arc Fault To conduct an AFD test 1 On the PWRcell inverter control panel use the left or right arrows to scroll to the page for the desired PV Link 2 Press t...

Page 23: ...20 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 24: ...ice If the PV Link is not operating as expected or if a PV Link error message appears on the Generac PWRcell Inverter control panel LCD display contact the nearest Independent Authorized Service Deale...

Page 25: ...22 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 26: ...the general health of a SnapRS device DMM Red to SnapRS DMM Black to SnapRS Resistance reads 300 k to 350 k Diode check reads 0 50 V to 0 55 V DMM Red to SnapRS DMM Black to SnapRS Resistance reads 1...

Page 27: ...24 Installation Manual for PV Link and SnapRS This page is intentionally left blank...

Page 28: ...ights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W29290...

Reviews: