Operation
Owner’s Manual for MLT Light Tower
17
Section 3: Operation
Light Tower Setup
Figure 3-1. Set Up Outriggers and Jacks
1. For maximum light coverage, position the unit at
ground level or in a spot higher than the area being
illuminated by the lamps.
NOTE:
The mast extends up to 30 ft (9.14 m).
2. See
. Place the unit on firm ground that
is relatively flat (less than 5° slope), and then block
the wheels to keep it from moving (A).This will
make it easier to level the unit.
3. Pull the locking pin on the tongue jack (B) and
rotate the jack 90° until the spring loaded locking
pin snaps back into place. Rotate the jack handle
clockwise to raise the trailer tongue off the towing
vehicle.
4. A grounding stud (C) is located on the frame of the
trailer near the trailer tongue. For grounding
requirements, follow National Electrical Code
(NEC), state, and local regulations.
5. Pull the locking pins (D) on the outriggers (E) and
pull each outrigger out until the spring loaded
locking pin snaps back into place. Pull the locking
pin on each outrigger jack and rotate each jack
180° so the jack pad is facing down and the spring
loaded locking pin snaps back into place.
6. Pull the locking pin on the rear jack (F) and rotate it
90º until the spring loaded locking pin snaps into
DETAIL C
DETAIL D
DETAIL G
DETAIL H
H
H
J
F
A
G
E
D
C
B
D
E
004697
(000260a)
High Voltage. Verify area above unit is clear
of overhead wires and obstructions. Contact
with high-voltage power lines will result in
death or serious injury.
DANGER
WARNING
(000297)
> 60 mph
> 60 mph
Do not set up the unit if high winds
are expected. High winds can cause the
unit to tip or fall, causing severe injury
or machine damage.
Discount-Equipment.com