Maintenance
Owner’s Manual for Australian 3-Phase 50 Hz Air-Cooled Generator Sets
27
Inspecting the Battery
Proceed as follows to inspect battery:
1.
Press OFF button to shut down generator set, then
lift lid and remove front panel.
2.
Remove the 7.5 amp fuse from control panel.
3.
Remove intake side panel. (See
4.
See
. Disconnect white battery charger
cable.
Figure 4-5. Disconnecting Battery Charger Cable
5.
See
. Inspect battery posts and cables
for tightness and corrosion. Tighten and clean as
necessary.
Figure 4-6. Battery Cables
6. (Unsealed batteries only):
Completely disconnect
battery. Check battery fluid level and, if necessary,
fill with distilled water only. DO NOT use tap water.
Have an IASD or a qualified service technician
check state of charge and condition.
7.
Connect positive battery cable, then negative bat-
tery cable.
8.
Connect battery charger cable.
9.
Install intake side panel, and install 7.5A fuse.
10.
Press AUTO button on controller to put generator
set into AUTO.
11.
Install front panel and close generator set lid.
Cleaning the Sediment Trap
A sediment trap removes contaminants (moisture and
fine particles) from gaseous fuels before they enter the
fuel regulator. Accumulated moisture and particles must
be emptied from sediment trap per local codes and
guidelines.
Proceed as follows to clean sediment trap:
1.
Remove intake side panel (see
2.
Turn off generator set fuel supply.
3.
See
. Unscrew and remove sediment
trap cap (A).
Figure 4-7. Cleaning the Sediment Trap
4.
Use a clean-out tool (not provided) to remove
accumulated moisture and particles from sediment
trap cap and body (B).
5.
Wipe inside of each component with a clean, dry,
lint-free cloth.
6.
Seal threads of sediment trap cap with appropriate
sealing compound. Install sediment trap cap and
hand-tighten.
7.
Tighten sediment trap cap with an appropriately
sized pipe wrench. DO NOT overtighten.
8.
Turn on generator set fuel supply. Inspect for leaks
by spraying all connection points with a non-corro-
sive gas leak detection fluid. The solution should
not be blown away or form bubbles.
9.
Install intake side panel.