![Generac Power Systems 006664-0 Instruction Manual Download Page 10](http://html.mh-extra.com/html/generac-power-systems/006664-0/006664-0_instruction-manual_2209341010.webp)
8
Transceiver Installation - 2013 and Later
NOTE:
Some 2013 units do not have the transceiver mounting holes. The template (provided)
must be used.
1. Affix the template, on the back of the generator enclosure, in the upper left corner. Align the
template with the left and top edges of the enclosure. Tape the template in place and mark the
enclosure, in preparation to drill the hole locations.
2. Inspect the area behind the template to ensure there is adequate clearance when drilling.
Move all wires to prevent damage.
3. Using the template, drill the harness opening and mounting holes.
4. Position transceiver on the back of the generator ensuring the gasket provides sealing.
5. Install transceiver to generator wall using 2 screws to secure the unit.
Wiring Procedure - All Years
1. Connect the 4-pin connector to the transceiver.
2. On 2008 Home Standby Units only, remove the fasteners that secure the controller and lift the
controller to access the accessory port.
4. If there is a decal labeled "Port 1", remove decal to locate connector. If there is no decal, locate
the open 8-pin connector on the underside of the controller.
5. Route cable to mate with the connector on the bottom of the controller.
6. Install the harness 8-pin connector into the controller's open socket. See controller drawings
to locate the proper location for the wiring loom connector of the open 8-pin connector.
NOTE:
The connector(s) will only fit one way. Do NOT force.
2008 Controller
Installation
Summary of Contents for 006664-0
Page 11: ...9 2010 Controller 2013 Controller Installation ...
Page 18: ...16 Notes ...
Page 31: ...9 Controlador 2010 Controlador 2013 Instalación ...
Page 38: ...16 Notas ...
Page 51: ...9 Régulateur 2010 Régulateur 2013 Installation ...
Page 58: ...16 Remarques ...