5
www.geiger.de
EN
EN
5. Installation instructions
Before fixing, the strength of the masonry or of the subsurface is to be checked.
I
Prior to installation please check to ensure there is no visible damage to
the motor like cracks or open cables.
I
Caution: If the tube is screwed/riveted to the drive, the measure must
be taken from the tube end to the center of the drive and marked on the
tube.
When inserting into the shaft, the tubular motor
must
not be struck and must not be allowed to fall
into the shaft.
When drilling the winding shaft never drill into the
area of the tubular motor!
Installation into the rolling shutter:
Fix the engine bearer into the shutter box.
Following options are available:
– Star-shaped engine bearer (M45F889)
– Fixation plate (M45F395)
– Clamp engine bearer (M45F885)
– Square bracket fixation (M45F397)
Insert the motor into the shaft with a suitable
adapter/drive up to the stop of the shaft adapter.
Insert the roller capsule on the opposite side.
Screw the square fixation (M45F396) with the
motor head.
On the opposite side pull out the roller capsule until
the bolt fits into the ball bearing.
Screw together the roller capsule with the shaft.
Screw together the shaft with the tube drive.
Secure the rolling shutter curtain to the shaft.
Alternative: screw the motor directly to the bracket (pitch circle 48 mm).
Installation into awnings and screens:
Insert the motor into the shaft with a suitable
adapter/drive up to the stop of the shaft adapter.
If available insert eyelet with extension into the
motor head and secure with Allen screw.
Fix the engine bearer to the awning.
Following options are available:
– Star-shaped engine bearer (M45F889)
– Fixation plate (M45F395)
Fix the motor together with the shaft on the engine
bearer and secure.
I
The GEIGER SOLIDline motor is suitable for shaft diameters
from 50 mm!