
76
OPERATION
T7D0371
T7D0381
T7D0391
Operations Possible with this Machine
IMPORTANT: Do not perform scooping or grading operations with the bucket cylinders
fully extended. The traction force will apply extremely heavy loads on the bucket
cylinders and this may damage them.
Scooping
Lower the lift arms and bring the bucket down to the ground with the front end tilted slightly
forward, then drive the loader forward until the bucket is filled with the material. Next tilt the
bucket backward and scoop up the material.
Grading
Tilt the front edge of the bucket down at an angle which is appropriate for the ground hardness,
then drive the loader forward slowly, digging into the ground with the cutting edge of the
bucket. When the bucket is full, tilt it backward.
Leveling
Raise the lift arms and tilt the bucket forward, then release it as the loader is driven forward.
Next tilt the bucket forward and lower the front edge until it is slightly above the ground
surface, then back the loader over the load which was just released.
Operating Procedures
Summary of Contents for CTL60
Page 1: ...CTL60 CTL70 CTL80 Compact Track Loader OPERATOR S MANUAL...
Page 6: ...4...
Page 8: ...6...
Page 58: ...56...
Page 85: ...83 Loading and Unloading 84 Securing the Machine 85 Cautions on Transporting 86 TRANSPORT...
Page 97: ...95 MEMO...
Page 100: ...98 MAINTENANCE Maintenance Log Date Hours Service Procedure...
Page 101: ...99 MAINTENANCE Maintenance Log Date Hours Service Procedure...
Page 148: ...146...
Page 149: ...147 Main Specifications 148 Machine Dimensions 152 Operating Range 154 SPECIFICATIONS...
Page 153: ...151 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions T7K0011 L M D J H K C F G A E B...
Page 156: ...154 SPECIFICATIONS Operating Range T7K0021 F H C A D B G E...
Page 158: ...156...
Page 159: ...157 General Precautions 158 OPTIONS...
Page 162: ...160...
Page 163: ...161 INDEX...