
10
80587_eView HD_02-2019_ENG
4.2. Installation Environment
Avoid prolonged exposition to direct sunlight to avoid the risk
of overheating the device.
The equipment is not intended for installation in contact with
corrosive chemical compounds. Check the
resistance of the front panel to a specific compound before
installation.
Do not use tools of any kind (screwdrivers, etc.) to operate
the touch screen of the panel.
In order to meet the front panel protection classifications,
proper installation procedure must be followed:
• the borders of the cutout must be flat
• screw up each fixing screw until the bezel corner get in
contact with the panel.
• the cutout for the panel must be of the dimensions indicated
in this manual.
The IP66 is guaranteed only if:
• max deviation from the plane surface to the cut-out: ±0.5mm
• thickness of the case where is mounted the equipment:
from 1,5mm to 6mm
• max surface roughness where the gasket is applied: ±120 um
A. eviewHD xx
B. Installation cut-out
4.3. Safety instruction
For all installation notes, please refer to the
Installation Guide provided with the product.
4.4. Installation Procedure
Place the fixing brackets contained in the fixing kit as shown
in figure
For all installation notes, please refer to the
Installation Guide provided with the product.