background image

3

Features

• 

Supports up to 200 Mbps data transmission rate

• 

Extension of up to 200 feet (60 meters)

• Web 

confi guration for easy maintenance

• Power 

Management

• 

Features include IGMP multicast, VLAN, and QOS packet management

• 

3DES 168 bits encryption used for secure operation

• 

Four RJ-45 Ethernet ports on Receiver Unit

Package Includes

(1) GefenTV Ethernet Over PLC Sender Unit
(1) GefenTV Ethernet Over PLC Receiver Unit
(2) 3 ft. Ethernet Cables
(2) AC Power Adapter Cables

FEATURES

Summary of Contents for GTV-ETH-2-PLC

Page 1: ...Ethernet Over PLC User Manual www gefentv com GTV ETH 2 PLC...

Page 2: ...omer Service 20600 Nordhoff St Chatsworth CA 91311 www gefentv com support gefentv com Notice Gefen Inc reserves the right to make changes in the hardware packaging and any accompanying documentation...

Page 3: ...ptions 6 Receiver Panel Layout 7 Receiver Panel Descriptions 8 GefenTV Ethernet Over PLC Software Installation 11 Connecting The GefenTV Ethernet Over PLC 17 Automatic Security Setup Feature 19 Advanc...

Page 4: ...ernet Over PLC Send RJ 45 Ethernet signals over power lines in the walls of your home with the GefenTV Ethernet Over Power Line Bridge The Bridge s sender and receiver units send Ethernet through the...

Page 5: ...nodes must be on the same power phase to communicate properly Multiple receiving nodes can be used on the same in house power line system to extend the network to multiple locations Performance of Ge...

Page 6: ...e Power Management Features include IGMP multicast VLAN and QOS packet management 3DES 168 bits encryption used for secure operation Four RJ 45 Ethernet ports on Receiver Unit Package Includes 1 Gefen...

Page 7: ...4 Top Panel 5 6 7 4 Back Panel 1 2 3 Front Panel SENDER PANEL LAYOUT...

Page 8: ...nfiguration please see page 17 Pressing this button for more than 10 seconds will perform a factory reset 4 AC Power Cable Input Input for the supplied AC power cable 5 LAN LED This LED will activate...

Page 9: ...6 Front Panel Back Panel Top Panel 1 4 2 3 5 6 7 8 9 10 RECEIVER PANEL LAYOUT...

Page 10: ...a is actively being trafficked to and from this port 6 LAN 2 LED This LED will activate when a connection from a valid Ethernet device to Ethernet port 2 is established It will blink when activity is...

Page 11: ...2 The auto run will begin the installation process If auto run does not start or auto run has been disabled please navigate to X drive where X is the drive letter or your CD ROM drive and run the auto...

Page 12: ...9 GEFENTV ETHERNET OVER PLC SOFTWARE INSTALLATION 5 Close all other applications and press the Next button to continue 6 Please read the license agreement and click on the I Agree button to continue...

Page 13: ...tton to change the installation location 8 The program files will copy to the specified location in the previous step When the process is complete you will see the window below Click on the finish but...

Page 14: ...h a solid blue color LAN LED When a valid Ethernet connection is detected on the sending and receiving Ethernet jacks their corresponding LED s will become active and should emit a solid blue color LI...

Page 15: ...rformed Automatic configuration is also possible using the Automatic Security Configuration feature on page 17 in lieu of the procedure outlined in this section 1 Ensure that both the local and remote...

Page 16: ...des must use the same Net ID and encryption passwords for proper operation These will be configured in the next step However it is important to configure the remote nodes first If the local node is co...

Page 17: ...I string up to 24 characters long ALIAS This name is for easy identification of the node This can be an ASCII string of up to 10 characters long This field is optional NEW PASSWORD CONFIGURATION PASSW...

Page 18: ...ote node is complete you will be presented with a window that will give the option to either return to the main configuration window or continue with advanced configuration For basic usage it will not...

Page 19: ...ds for the local node The Alias field should be set to a different name as the remote node for easy identification Once the information has been input click on the next button to continue A confirmati...

Page 20: ...figuration Mode ASCM This mode is initialized by pressing and holding the Security Reset button on the front panel for approximately 2 seconds Once the node s Power LED begins flashing RED release the...

Page 21: ...lave nodes have to be in ASCM To do this press and hold the Security Reset button on the Master node for approximately 2 seconds The Power LED should begin flashing RED Within 30 seconds press and hol...

Page 22: ...on the MAC address of the node you wish to configure and click on the advanced button to the left of the node listing General Hardware Reset This will reboot the node Settings made in this menu will b...

Page 23: ...firmware from a file Please see the Firmware Update section on page 27 for full details Network IP Configuration For access to the node s web configuration tool an IP address must be assigned Options...

Page 24: ...disable the node s ability to transmit IGMP multicast data Security The security tab will allow the user to adjust the configuration password the encryption password the network ID and the alias for t...

Page 25: ...a If this feature is enabled on one of the nodes it must be set on all other for VLAN tag packets to pass QOS QOS Quality Of Service is supported for managing traffic between nodes The supported proto...

Page 26: ...1 UDP is high priority TCP is low priority 2 TCP is high priority UDP is low priority 3 UDP port XXXX is high priority the rest is low priority 4 UDP port XXXX is low priority the rest is high priorit...

Page 27: ...ned on page 20 The IP address can either be assigned by the DHCP server or a static IP address can be manually assigned Authentication The browser should open the authentication page displayed below A...

Page 28: ...ith all the current configuration information see page 26 Clicking on the change configuration link will navigate to a new page where all configuration options will be available for adjustment see bel...

Page 29: ...y clicking on any of the Return to main page links FURTHER INFORMATION This page will display all of the information and status of the current node The following sections are listed System Information...

Page 30: ...server IP address 3 Enter the user name and password 4 Enter the name of the file if the file is not in the root directory of the TFTP or FTP directory you have to write the whole route from root ser...

Page 31: ...n Power AC 100 240V 50 60Hz 0 15A Power Consumption 8W 230V Max 7W 110V Max Operating Temp 0 40 C 32 104 F Operating Humidity 10 90 non condensing Storage Temp Range 20 70 C 4 158 F Storage Humidity 5...

Page 32: ...Proof of sale may be required in order to claim warranty 2 Customers outside the US are responsible for shipping charges to and from Gefen 3 Copper cables are limited to a 30 day warranty and cables...

Page 33: ...Rev X4 MA GTV ETH 2 PLC Pb 20600 Nordhoff St Chatsworth CA 91311 1 800 545 6900 818 772 9100 fax 818 772 9120 www gefen com support gefen com This product uses UL listed power supplies...

Reviews: