10
v3-8 23052017
4
DELIVERY AND
HANDLING
4.1
Safety instructions
The following safety instructions are to be taken into
account when handling, installing and using the
equipment.
•
Do not lift the equipment from any other than the
points indicated on the manual.
•
Remove the plug from the socket before carrying
out any maintenance measures.
•
Never compromise safety by bypassing safety
devices.
•
Only qualified personnel should conduct
maintenance / repair measures on the cooling
unit of the equipment.
•
The heat pump is not to be flushed with water.
•
Keep all the shell plates in place to prevent water
splashing on the electronic components of the
equipment.
4.2
Delivery contents
•
Ground source heat pump
•
Installation, operating and maintenance manual
1 pc
•
Outdoor temperature sensor
1 pc
•
Safety valve for heating circuit
G1/2” – 2.5 bar
1 pc
•
Safety valve for domestic water circuit
G1/2” – 10 bar
1 pc
•
Supply cord with power plug
1 pc
4.3
Optional accessories
•
Collector valve group
•
Qi installation set (with or without pump)
•
Qi R installation set
•
Heating control group
•
SMS/WEB server, SMARTWEB
•
Cooling control group
•
Cooling convector
•
Buffer accumulator for domestic water
•
Buffer accumulator for heating
•
Circulation pump set for domestic water
•
Pool heating set
•
Diaphragm expansion vessel for collector
•
Diaphragm expansion vessel for heating
•
Energy measurement
4.4
Storage
Before installation, the ground source heat pump must be
kept in its delivery package in a dry and warm location.
4.5
Transport
The heat pump may be temporarily tilted, but it must not
be left inclined for a long period of time, not even in
transit. The heat pump’s maximum tilt angle is 20°. It is
not recommended to turn the pump on its side.
However, if there is a need to turn the heat pump on its
side, for transport purposes, for example, the compressor
unit must be removed for the duration of transit. In any
case the heat pump must not be transported on its back. If
the heat pump has been tilted in transit, you must allow
the pump to stand upright for at least two hours before
activation so that the compressor’s (K1) lubrication oil has
time to reach the required locations. Only lift the heat
pump by the pallet. The pump must be transported on the
pallet all the way to the installation location.
Summary of Contents for Qi 10
Page 1: ...WWW GEBWELL COM Installation Operation and Maintenance Manual Qi Ground Source Heat Pump...
Page 55: ...Gebwell Qi Installation operation and maintenance manual 55 18 ENERGY LABELS...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 63: ......