Gebwell G-Energy Installation, Operation And Maintenance Manual Download Page 12

 
 

 
12  

Gebwell G-Energy 

11

 

 Accumulator technical specifications  

 

G-Energy Custom Accumulator – fully customized accumulator 

 

Volume – 501, 1000, 2000, 3000, 4000 or 5000 litres 

Pressure class – 1,5-10 bar 

Connections – number, size and disposition as required 

Tank material – FE, HST or RST 

Insulation material – urethane, cell rubber or without insulation 

Bulkhead – equipped with or without bulkhead 

Model 

 

Custom 501 

Custom 1000 

Custom 2000 

Custom 3000 

Custom 4000 

Custom 5000 

Tank volume 

501 

1000 

2000 

3000 

4000 

5000 

Height  

mm* ** 

2010 / 2030 

2130 / 2150 

2200 / 2250 

2350 / 2400 

2400 / 2450 

2500 / 2550 

Height

         low-height 

mm* ** 

 

1980 / 2000 

 

 

 

 

Diameter 

mm** 

600 / 780 

850 / 1030 

1200 / 1380 

1400 / 1580 

1600 / 1780 

1800 / 1980 

Tilt measurement   

mm*** 

2100 

2200 

2300 

2450 

2600 

2700 

Weight 

kg 

depending on the 

model 

depending on the 

model 

depending on the 

model 

depending on the 

model 

depending on the 

model 

depending on the 

model 

Connection sizes 

 

as desired 

as desired 

as desired 

as desired 

as desired 

as desired 

Max coil size 

 

LK45 

LK55 

LK110 

LK110 

LK110 

LK110 

Number of heater 
connections 

pc 

as desired 

 

as desired 

as desired 

as desired 

as desired 

as desired 

Max size electric heater 

kW 

12 

12 

12 

12 

12 

12 

Max temperature 

°C 

110 

110 

110 

110 

110 

110 

Max operating pressure 

bar 

1,5-10 

1,5-10 

1,5-10 

1,5-10 

1,5-10 

1,5-10 

 

Domestic hot water coil 

Model 

GTIN 

Max flow 

l/s

 

Copper pipe 

length 

m

 

Heat transfer 

area 

m

2

 

Connection 

DN/UK

 

Flange 

diameter  

mm

 

Feasibility 

tank capacity 

LK35 coil 

5362300 

0,5 

2,1 

20 

200 

501–5000 

LK45 coil  

5361955 

0,5 

12 

2,8 

20 

200 

1000–5000* 

LK55 coil 

5361956 

1,0 

2 x 6 

2,8 

32 

200 

1000–5000 

LK65 coil  

5362603 

1,0 

2 x 9 

4,2 

32 

200 

2000–5000 

LK90 coil  

5361957 

1,0 

2 x 12 

5,7 

32 

200 

2000–5000 

LK110 coil 

5361958 

1,5 

3 x 9 

6,4 

40 

300 

2000–5000 

 

Summary of Contents for G-Energy

Page 1: ...Installation operation and maintenance manual G Energy...

Page 2: ...e 4 1 and 4 3 of the Pressure Equipment Directive 2014 68 EU in order to ensure their safe operation KEEP THE OPERATION INSTRUCTIONS IN THE IMMEDIATE VICINITY OF THE DEVICE You should familiarise your...

Page 3: ...damage the device and weaken the efficiency of the device Please bear in mind that a visit by a retailer or service technician is not free even during the warranty period if the repair is done due to...

Page 4: ...llation operation and maintenance manual and consider whether you have followed the manual when using the device ensure before making the request that the warranty period has not run out you have care...

Page 5: ...hed to each other with quick latches which makes it easy to remove or install them The accumulator s connections do not reside inside the insulation to facilitate pipe installations the connections ex...

Page 6: ...d lifting the device in an oblique direction is prohibited If the accumulator is transported to its site of installation lying on its side the length of the accumulator in this position must be taken...

Page 7: ...ucing the height of the accumulator by 150mm Lift the accumulator up from the hoist ring or alternatively remove the insulation see the previous page for instructions and carefully turn the accumulato...

Page 8: ...ed at the bottom part of the accumulator with the size of the connection being 1 4 2 Filling The accumulator should be filled with water that is as warm as possible in order to facilitate bleeding and...

Page 9: ...e box to the fastening screw 4 Thread the metal installation ring of the box over the heaters connectors Fasten the bottom of the box using hexagon socket head screws ensuring that the installation ri...

Page 10: ...allation and use The load exerted by a filled accumulator on the floor including any need to reinforce the floor Any risks posed by the fluid in the system in connection with installation use and main...

Page 11: ...ollowing inspections have been carried out V Hot water Notes shut off valves mixing valve Cold water shut off valves mixing valve safety valve Electricity connected power supply sensors temperature li...

Page 12: ...l depending on the model depending on the model depending on the model depending on the model depending on the model Connection sizes as desired as desired as desired as desired as desired as desired...

Reviews: