![Geberit Rapid 616.290.00.1 Operation Manual Download Page 39](http://html1.mh-extra.com/html/geberit/rapid-616-290-00-1/rapid-616-290-00-1_operation-manual_573079039.webp)
EN
Setting the flush interval
The following table is used to calculate the flush interval. A flush
interval of 3 days is set at the factory.
Table 3: Calculating the flush interval
Minimum requirements in accordance with
Flush interval
[Days]
DIN EN 806-4:2010-06
7
VDI/DVGW 6023:2013-04
3
Increased requirements
1
9007206954690955-1 © 02-2021
970.123.00.0(00)
39