®
! Observe table "Torques for half rings and clamp connections", see section
Section 10.6.5, Page 72
4.
Interrupt the compressed air supply to the connection (61).
®
The valve disk (15) is lowered.
5.
Check function after assembly.
®
Side valve is assembled.
Spring-opening valve NO
Notice
Sensitive valve parts
Damage to valve parts.
► Protect the valve parts against impact stress.
Carry out the following steps:
1.
Guide the valve insert completely into the housing (401).
2.
Grease the thread of the clamp connections (43) and install.
®
! Ensure that the clamp connections (43) are firmly installed.
®
! Observe table "Torques for half rings and clamp connections",
seeSection 10.6.5, Page 72
3.
Check function after assembly.
®
Side valve is assembled.
10.6.5 Torques for the Clamps and Clamp Connections
Tighten the clamp connections and clamps of the valve as well as the valve insert
to the torque values specified in the table.
Torques
[Nm]
[lbft]
Clamps on the
control top
1
0.7
Clamp connection
cast half rings
M6
9
6.6
Clamp connection
cast half rings
M8
22
16.2
Cast clamps
M10
45
33
Valve insert
assembly
M12
35
25.8
M14
45
33
Maintenance
Assembling the valve
430BAL013307EN_8
72
04.08.2022
Summary of Contents for D-tec D
Page 66: ...Fig 39 Maintenance Assembling the valve 430BAL013307EN_8 66 04 08 2022...
Page 69: ...Fig 41 Maintenance Assembling the valve 430BAL013307EN_8 04 08 2022 69...
Page 85: ...Fig 55 Housing Parts list D tec double chamber valve type D DV 430BAL013307EN_8 04 08 2022 85...
Page 91: ...Fig 58 hard seal Parts list D tec valve insert D DV SV NC NO 430BAL013307EN_8 04 08 2022 91...
Page 99: ...Fig 61 Dimension sheet double chamber valve type D DV 430BAL013307EN_8 04 08 2022 99...
Page 105: ...Appendix 430BAL013307EN_8 04 08 2022 105...
Page 106: ......