09
430
-08
.2
01
6-
Gb
20
4.6 Assembling the terminal box
¾
Install the terminal box with the seal.
¾
Fasten the connections to the terminal board and the motor protection device.
X
Install the terminal box cover.
Make sure that the sealing lip is not damaged!
¾
Connect the oil sump heater on the terminal box.
8,5 Nm
15 Nm
INFO
X
Mount all cable screws to the terminal box with care, so the the IP protection type continues
to be guaranteed.
X
Observe the tightening torques!
Assembly
Summary of Contents for Bock HGX2 CO2 T Series
Page 23: ...09430 08 2016 Gb 23 ...