D
GB
F
E
I
Ru
21
09651-08.2018-DGbFEIRu
Relay position INT69 G
B2 12 14 11
Fig. 22
5.10 Function test of the trigger unit INT69 G
Before commissioning, after troubleshooting or making changes to the control power circuit, check
the functionality of the trigger unit. Perform this check using a continuity tester or gauge.
5
|
Electrical connection
Gauge state
Relay position
1.
Deactivated state
11-12
2.
INT69 G switch-on
11-14
3.
Remove PTC connector
11-12
4.
Insert PTC connector
11-12
5.
Reset after mains on
11-14
5.11 Fan motor
The fan motor for cooling the compressor is already wired in the terminal box. The power supply as
well as triggering of the compressor contactor should be made in accordance with the basic circuit
diagram (in the terminal box). The fan motor is protected by an internal temperature monitor.
Electrical data: 230 V - 1 - 50/60 Hz, 40 W - 0,3 A