![GE SE 250 Mighty Small II Operating Instructions Manual Download Page 28](http://html.mh-extra.com/html/ge/se-250-mighty-small-ii/se-250-mighty-small-ii_operating-instructions-manual_128044028.webp)
4
Installation
About this chapter
This chapter provides required information to enable users and service personnel to
unpack the SE 250/260 Mighty Small II instrument.
Safety precautions
CAUTION
When lifting and moving the instrument be careful not to drop it.
This may cause injury.
CAUTION
Make sure that the system is placed on a stable, level bench with
adequate space for ventilation.
Unpacking procedure
Unwrap all packages carefully.
Inspect all visible parts for damage or missing pieces. If any damage is observed, record
this on the receiving documents and inform your GE representative. Make sure to keep
all packing material for damage claims or to use should it become necessary to return
the unit.
28
SE 250/260 Mighty Small II Operating Instructions 29281629 AA
4 Installation