GE Monogram ZV900 Installation Instructions Manual Download Page 5

Installation Preparation

4

ADVANCE PLANNING

Determine the exact location of the vent hood.

Plan the route for venting exhaust to the outdoors.

Use the shortest and straightest duct route possible. For
satisfactory performance, duct run should not exceed 100 ft.
equivalent length for any duct configurations.

Refer to “Duct Fittings” chart to compute the maximum
permissible length for duct runs to the outdoors.

CAUTION:

To reduce risk of fire and to properly

exhaust air, be sure to duct air outside—do not vent exhaust
air into spaces within walls or ceilings or into attics, crawl
spaces or garages.

PRUDENCE :

Il faut prendre soin d’installer un

conduit vers l’extérieur pour réduire le risque d’incendie et
pouvoir évacuer l’air correctement. Il ne faut pas évacuer l’air
correctement. Il ne faut pas évacuer l’air dans l’espace entre
les parois d’un mur, un plafond ou un grenier, un espace
sanitaire ou un garage.

Use metal ductwork only. These hoods must use 
8

round duct.

Install a wall cap with damper or roof cap at the exterior
opening. Order the wall or roof cap and any transition
needed in advance. 

Wall Framing for Adequate Support

This vent hood is heavy. Adequate structural support must
be provided in all types of installations. The hood must be
secured to vertical studs in the wall, or to a horizontal
support.

The vent hood should be on site before final framing and 
wall finishing. This will help to accurately locate the duct
work and electrical service. 

Installation will be easier if the vent hood is installed before
the cooktop and countertop are installed.

Accessory Duct Cover

This hood is shipped with a decorative duct cover for ceiling
heights of 7

11

to 9

5

. ZX90010 duct cover accessory 

is available to reach 9

6

to 10

′ 

5

ceiling heights. The

accessory should be ordered with the hood and be 
on site before installation begins.

POWER SUPPLY

IMPORTANT – (Please read carefully)

WARNING: 

FOR PERSONAL SAFETY, THIS

APPLIANCE MUST BE PROPERLY GROUNDED.

AVERTISSEMENT :

POUR DES RAISONS DE

SÉCURITÉ, CET APPAREIL DOIT ÊTRE CORRECTEMENT MISE 
À LA TERRE.
Remove house fuse or open circuit breaker before beginning
installation.
Do not use an extension cord or adapter plug with this
appliance. Follow National electrical codes or prevailing local
codes and ordinances. 

Electrical supply

These vent hoods must be supplied with 120V, 60Hz, and
connected to an individual, properly grounded branch circuit,
and protected by a 15 or 20 amp circuit breaker or time delay
fuse.

Wiring must be 2 wire with ground.

If the electrical supply does not meet the above
requirements, call a licensed electrician before proceeding.

Route house wiring as close to the installation location as
possible, in the ceiling or back wall.

Connect the hood wiring to the house wiring in accordance
with local codes.

Grounding instructions

The grounding conductor must be connected to a grounded
metal, permanent wiring system, or an equipment-grounding
terminal or lead on the hood.

WARNING:

The improper connection of the

equipment-grounding conductor can result in a risk of 
electric shock. Check with a qualified electrician or service
representative if you are in doubt whether the appliance is
properly grounded.

AVERTISSEMENT :

Le mauvais branchement du

fil de mise à la terre peut causer un choc électrique. En cas de
doute, consulter un électricien qualifié ou un technicien pour
déterminer si l’appareil est à la terre.

CAUTION:

Automatically Operated Device – 

To reduce the risk of injury disconnect from power supply
before servicing. This unit is equipped with an integral
disconnecting switch located inside the blower housing.

PRUDENCE :

Appareil commandé

automatiquement. Afin de réduire les risques de blessure,
débranchez l’appareil de l’alimentation électrique avant de
procéder à une réparation. L’appareil est équipé d’un
sectionneur intégral situé à l’intérieur du logement du
ventilateur.

Summary of Contents for Monogram ZV900

Page 1: ...Installation Instructions 36 Glass Canopy Chimney Vent Hood ZV900 49 80328 04 06 JR ...

Page 2: ...4 5 8 to top of bracket C L ALIGN BOTTOM EDGE WITH PENCIL LINE INDICATING BOTTOM OF THE HOOD Drill 2 two 3 16 pilot holes through studs or rear wall support REAR WALL MOUNTING TEMPLATE 49 80405 04 06 JR ...

Page 3: ...er off at the service panel and lock service panel to prevent power from being switched on accidentally If the service panel cannot be locked fasten a tag or prominent warning label to the panel AVERTISSEMENT POUR RÉDUIRE LE RISQUE D INCENDIE DE CHOC ÉLECTRIQUE OU DE BLESSURES IL FAUT OBSERVER LES REGLES SUIVANTES A Utiliser cet appareil uniquement de la maniére prévue par le fabricant En cas de q...

Page 4: ...p 5 Mount the Hood 12 Step 6 Level the Hood 12 Step 7 Connect Ductwork 12 Step 8 Connect Electrical 13 Step 9 Install Duct Covers 14 Step 10 Install Filters 14 Step 11 Finalize Installation 14 Installation Recirculating Ductwork Wiring Locations 15 Step 1 Install Framing for Hood Support 15 Step 2 Install Mounting Bracket 16 Step 3 Install Duct Bracket 16 Step 4 Prepare the Hood 17 Step 5 Mount th...

Page 5: ...lation begins POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED AVERTISSEMENT POUR DES RAISONS DE SÉCURITÉ CET APPAREIL DOIT ÊTRE CORRECTEMENT MISE À LA TERRE Remove house fuse or open circuit breaker before beginning installation Do not use an extension cord or adapter plug with this appliance Follow National electrical codes or prev...

Page 6: ...y standards such as those published by NFPA and ASHRAE This Hood Must Use an 8 Round Duct 5 Installation Preparation Total Equivalent Quantity Equivalent Duct Piece Dimensions Length Used Length Round 1 ft straight per foot length 3 1 4 x 12 1 ft 3 1 4 x 24 per foot straight length 8 round 90 elbow 15 ft 8 round 45 elbow 8 ft 3 1 4 x 12 90 elbow 11 ft 3 1 4 x 12 or 45 elbow 6 ft 3 1 4 x 12 90 flat...

Page 7: ...LS AND MATERIALS REQUIRED NOT SUPPLIED Tape measure Knife Spirit level Wire cutter stripper Wire nuts Electric drill with 5 16 and 3 8 bits Phillips and flat blade screwdrivers Hammer Pliers Safety glasses Duct tape Tape to mount template Gloves to protect against sharp edges 120V 60Hz 15 or 20 Amp 2 wire with ground Properly grounded branch circuit Strain relief for junction cover 8 round metal d...

Page 8: ... to 30 10 24 to 30 24 to 30 10 1 24 to 30 24 to 30 10 2 25 to 30 24 to 30 10 3 26 to 30 25 to 30 10 4 27 to 30 26 to 30 10 5 28 to 30 27 to 30 Based on 36 countertop height ACCESSORY ZX90010 SUPPLIED DETERMINE INSTALLATION HEIGHT Telescopic duct covers are provided to conceal the ductwork running to the ceiling This hood can be installed for recirculating operation No kits required The vent hood m...

Page 9: ...only Air deflector for recirculating installation only Duct bracket 14 5 8 to top of bracket C L ALIGN BOTTOM EDGE WITH PENCIL LINE INDICATING BOTTOM OF THE HOOD Drill 2 two 3 16 pilot holes through studs or rear wall support REAR WALL MOUNTING TEMPLATE 49 80405 04 06 JR Wall mount template 8 HARDWARE PACKAGE Locate and count screws 3 wood screws 3 wall fasteners 3 wall bracket screws 12 hood atta...

Page 10: ...ge 7 Mark that location Use a level to draw a straight pencil line on the wall Tape the template in position along the penciled line CHECK TO BE SURE THE TEMPLATE IS LEVEL Ceiling ducting If ductwork will vent straight up to the ceiling Use a level to draw a line straight up from the centerline on the template to the ceiling Measure 5 1 2 from the back wall to the centerline of an 8 1 2 hole on th...

Page 11: ...cure the bracket to the wall with wood screws and or fasteners 3 INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark mounting bracket screw locations Drill 3 16 pilot holes in 2 of the punched locations in the lower bracket Remove the template Use wood screws to secure the mounting bracket to the wall ...

Page 12: ...k Slip the bottom flange of the motor housing into the side slots at the top rear opening Carefully lay the hood on its back Fasten the hood to the motor housing from the bottom using 6 screws Join two cable connectors at the front of the hood 4 Rear mounting hooks INSTALLATION VENTED TO THE OUTSIDE Engage flange on motor housing into slots Rear view Bottom view Rear side Front side To Lights To C...

Page 13: ... THE OUTSIDE 12 MOUNT THE HOOD WARNING 2 people are required to lift and position the hood onto the mounting bracket AVERTISSEMENT If faut deux personnes pour lever et mettre en place la hotte sur le support de montage Lift the hood onto the mounting bracket Position a spirit level at the bottom of the hood to check side to side leveling 5 LEVEL THE HOOD This hood has built in levelers on the moun...

Page 14: ...uand les fils sont en aluminium il faut prendre soin d utiliser des connecteurs aluminium à cuivre avec une pâte antioxydante approuvée par U L Remove junction box cover and knockout on the left side Secure the house wiring to the junction box with a strain relief Connect white leads to branch circuit white lead Connect black leads to branch circuit black lead Connect green yellow leads to branch ...

Page 15: ...ons INSTALLATION VENTED TO THE OUTSIDE 14 Mounting screws INSTALL FILTERS IMPORTANT Check to be sure that the main ON OFF switch next to the motor is in the ON position Remove protective film on the filters Tip the filter into the left or right side of the opening Lift the filter to the opposite side and into the filter lock To remove the filter pull the filter lock downward 10 FINALIZE INSTALLATI...

Page 16: ... the bottom of the hood and within 6 of the centerline INSTALL FRAMING FOR HOOD SUPPORT IMPORTANT Framing must be capable of supporting 100 lbs If drywall is present mark the screw hole locations for the top mounting brackets Remove the template Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template Install a horizontal support at least 1 x 6 between t...

Page 17: ...ors to expand Remove the screws Secure the bracket to the wall with wood screws and or fasteners 3 INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark mounting bracket screw locations Drill 3 16 pilot holes in 2 of the punched locations in the lower bracket Remove the template Use wood screws to secure...

Page 18: ... lift and position the hood onto the mounting bracket AVERTISSEMENT If faut deux personnes pour lever et mettre en place la hotte sur le support de montage Lift the hood onto the mounting bracket Position a spirit level at the bottom of the hood to check side to side leveling 5 LEVEL THE HOOD This hood has built in levelers on the mounting hooks at each side Use a long Phillips screwdriver from th...

Page 19: ...low leads to branch circuit green lead or bare ground lead Secure all connections with wire nuts on each electrical connector Push wires into junction box and replace cover Be sure wires are not pinched Secure J Box cover with original screw 8 Installation Instructions INSTALLATION RECIRCULATING 18 SIZE AND CUT DUCT PIECE Hold upper air deflector with duct connector against the ceiling Measure fro...

Page 20: ...emove all tape and packing material Refer to the Owner s Manual for operating instructions 11 INSTALL DUCT COVERS Place the decorative duct covers on top of the hood NOTE The inside piece has holes on one end intended for use when the hood is installed for recirculating purposes Be sure the vented end is at the top the vent holes will be visible in this installation The inside duct piece must slip...

Page 21: ...or Monogram local service in your area call 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice GE Consumer Industrial GE Appliances General Electric Company Louisville KY 40225 ge com 2006 GE Company ...

Reviews: