GE Monogram ZV900 Installation Instructions Manual Download Page 19

CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:

If house wiring is not 2-wire 

with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be
sure to use U.L. approved anti-oxidant compound
and aluminum-to-copper connectors.

AVERTISSEMENT :

Si la maison n’est pas câblee avec deux fils et un 
fil de terre, l’installateur doit installer un fil de terre.
Quand les fils sont en aluminium, il faut prendre soin
d’utiliser des connecteurs aluminium à cuivre avec
une pâte antioxydante approuvée par U.L.

Remove junction box cover and knockout on the
left side. 

Secure the house wiring to the junction box with 
a strain relief.

Connect white leads to branch circuit white lead.

Connect black leads to branch circuit black lead.

Connect green/yellow leads to branch circuit
green lead or bare ground lead.

Secure all connections with wire nuts on each
electrical connector.

Push wires into junction box and replace cover. 
Be sure wires are not pinched.

Secure J-Box cover with original screw.

8

Installation Instructions

INSTALLATION—RECIRCULATING

18

SIZE AND CUT DUCT PIECE

Hold upper air deflector
with duct connector
against the ceiling.

Measure from the bottom
of the air deflector to the
top of the hood as
shown. Reduce that
dimension by 1

to

facilitate installation. 
The duct will cover 
and overlap the deflector
and the hood outlets.

Cut the duct piece to size and
slip onto the bottom of the
deflector.

Place the assembled deflector
and duct over the exhaust
outlet.

Hold the assembly against the
duct bracket.

Drive 4 screws into the bottom
of the deflector and into the
bracket.

Use duct tape to seal duct 
to the deflector and at the
exhaust outlet.

7

Measure 

length

Deflector

Duct

length

Knockout

J-Box

cover

House wiring

J-Box

cover

Summary of Contents for Monogram ZV900

Page 1: ...Installation Instructions 36 Glass Canopy Chimney Vent Hood ZV900 49 80328 04 06 JR ...

Page 2: ...4 5 8 to top of bracket C L ALIGN BOTTOM EDGE WITH PENCIL LINE INDICATING BOTTOM OF THE HOOD Drill 2 two 3 16 pilot holes through studs or rear wall support REAR WALL MOUNTING TEMPLATE 49 80405 04 06 JR ...

Page 3: ...er off at the service panel and lock service panel to prevent power from being switched on accidentally If the service panel cannot be locked fasten a tag or prominent warning label to the panel AVERTISSEMENT POUR RÉDUIRE LE RISQUE D INCENDIE DE CHOC ÉLECTRIQUE OU DE BLESSURES IL FAUT OBSERVER LES REGLES SUIVANTES A Utiliser cet appareil uniquement de la maniére prévue par le fabricant En cas de q...

Page 4: ...p 5 Mount the Hood 12 Step 6 Level the Hood 12 Step 7 Connect Ductwork 12 Step 8 Connect Electrical 13 Step 9 Install Duct Covers 14 Step 10 Install Filters 14 Step 11 Finalize Installation 14 Installation Recirculating Ductwork Wiring Locations 15 Step 1 Install Framing for Hood Support 15 Step 2 Install Mounting Bracket 16 Step 3 Install Duct Bracket 16 Step 4 Prepare the Hood 17 Step 5 Mount th...

Page 5: ...lation begins POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED AVERTISSEMENT POUR DES RAISONS DE SÉCURITÉ CET APPAREIL DOIT ÊTRE CORRECTEMENT MISE À LA TERRE Remove house fuse or open circuit breaker before beginning installation Do not use an extension cord or adapter plug with this appliance Follow National electrical codes or prev...

Page 6: ...y standards such as those published by NFPA and ASHRAE This Hood Must Use an 8 Round Duct 5 Installation Preparation Total Equivalent Quantity Equivalent Duct Piece Dimensions Length Used Length Round 1 ft straight per foot length 3 1 4 x 12 1 ft 3 1 4 x 24 per foot straight length 8 round 90 elbow 15 ft 8 round 45 elbow 8 ft 3 1 4 x 12 90 elbow 11 ft 3 1 4 x 12 or 45 elbow 6 ft 3 1 4 x 12 90 flat...

Page 7: ...LS AND MATERIALS REQUIRED NOT SUPPLIED Tape measure Knife Spirit level Wire cutter stripper Wire nuts Electric drill with 5 16 and 3 8 bits Phillips and flat blade screwdrivers Hammer Pliers Safety glasses Duct tape Tape to mount template Gloves to protect against sharp edges 120V 60Hz 15 or 20 Amp 2 wire with ground Properly grounded branch circuit Strain relief for junction cover 8 round metal d...

Page 8: ... to 30 10 24 to 30 24 to 30 10 1 24 to 30 24 to 30 10 2 25 to 30 24 to 30 10 3 26 to 30 25 to 30 10 4 27 to 30 26 to 30 10 5 28 to 30 27 to 30 Based on 36 countertop height ACCESSORY ZX90010 SUPPLIED DETERMINE INSTALLATION HEIGHT Telescopic duct covers are provided to conceal the ductwork running to the ceiling This hood can be installed for recirculating operation No kits required The vent hood m...

Page 9: ...only Air deflector for recirculating installation only Duct bracket 14 5 8 to top of bracket C L ALIGN BOTTOM EDGE WITH PENCIL LINE INDICATING BOTTOM OF THE HOOD Drill 2 two 3 16 pilot holes through studs or rear wall support REAR WALL MOUNTING TEMPLATE 49 80405 04 06 JR Wall mount template 8 HARDWARE PACKAGE Locate and count screws 3 wood screws 3 wall fasteners 3 wall bracket screws 12 hood atta...

Page 10: ...ge 7 Mark that location Use a level to draw a straight pencil line on the wall Tape the template in position along the penciled line CHECK TO BE SURE THE TEMPLATE IS LEVEL Ceiling ducting If ductwork will vent straight up to the ceiling Use a level to draw a line straight up from the centerline on the template to the ceiling Measure 5 1 2 from the back wall to the centerline of an 8 1 2 hole on th...

Page 11: ...cure the bracket to the wall with wood screws and or fasteners 3 INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark mounting bracket screw locations Drill 3 16 pilot holes in 2 of the punched locations in the lower bracket Remove the template Use wood screws to secure the mounting bracket to the wall ...

Page 12: ...k Slip the bottom flange of the motor housing into the side slots at the top rear opening Carefully lay the hood on its back Fasten the hood to the motor housing from the bottom using 6 screws Join two cable connectors at the front of the hood 4 Rear mounting hooks INSTALLATION VENTED TO THE OUTSIDE Engage flange on motor housing into slots Rear view Bottom view Rear side Front side To Lights To C...

Page 13: ... THE OUTSIDE 12 MOUNT THE HOOD WARNING 2 people are required to lift and position the hood onto the mounting bracket AVERTISSEMENT If faut deux personnes pour lever et mettre en place la hotte sur le support de montage Lift the hood onto the mounting bracket Position a spirit level at the bottom of the hood to check side to side leveling 5 LEVEL THE HOOD This hood has built in levelers on the moun...

Page 14: ...uand les fils sont en aluminium il faut prendre soin d utiliser des connecteurs aluminium à cuivre avec une pâte antioxydante approuvée par U L Remove junction box cover and knockout on the left side Secure the house wiring to the junction box with a strain relief Connect white leads to branch circuit white lead Connect black leads to branch circuit black lead Connect green yellow leads to branch ...

Page 15: ...ons INSTALLATION VENTED TO THE OUTSIDE 14 Mounting screws INSTALL FILTERS IMPORTANT Check to be sure that the main ON OFF switch next to the motor is in the ON position Remove protective film on the filters Tip the filter into the left or right side of the opening Lift the filter to the opposite side and into the filter lock To remove the filter pull the filter lock downward 10 FINALIZE INSTALLATI...

Page 16: ... the bottom of the hood and within 6 of the centerline INSTALL FRAMING FOR HOOD SUPPORT IMPORTANT Framing must be capable of supporting 100 lbs If drywall is present mark the screw hole locations for the top mounting brackets Remove the template Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template Install a horizontal support at least 1 x 6 between t...

Page 17: ...ors to expand Remove the screws Secure the bracket to the wall with wood screws and or fasteners 3 INSTALL MOUNTING BRACKET This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark mounting bracket screw locations Drill 3 16 pilot holes in 2 of the punched locations in the lower bracket Remove the template Use wood screws to secure...

Page 18: ... lift and position the hood onto the mounting bracket AVERTISSEMENT If faut deux personnes pour lever et mettre en place la hotte sur le support de montage Lift the hood onto the mounting bracket Position a spirit level at the bottom of the hood to check side to side leveling 5 LEVEL THE HOOD This hood has built in levelers on the mounting hooks at each side Use a long Phillips screwdriver from th...

Page 19: ...low leads to branch circuit green lead or bare ground lead Secure all connections with wire nuts on each electrical connector Push wires into junction box and replace cover Be sure wires are not pinched Secure J Box cover with original screw 8 Installation Instructions INSTALLATION RECIRCULATING 18 SIZE AND CUT DUCT PIECE Hold upper air deflector with duct connector against the ceiling Measure fro...

Page 20: ...emove all tape and packing material Refer to the Owner s Manual for operating instructions 11 INSTALL DUCT COVERS Place the decorative duct covers on top of the hood NOTE The inside piece has holes on one end intended for use when the hood is installed for recirculating purposes Be sure the vented end is at the top the vent holes will be visible in this installation The inside duct piece must slip...

Page 21: ...or Monogram local service in your area call 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice GE Consumer Industrial GE Appliances General Electric Company Louisville KY 40225 ge com 2006 GE Company ...

Reviews: